Revision history of "Energy optimisation of the production process in PYROTEK CZ, s.r.o." (Q18625)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

11 June 2023

17 February 2023

3 July 2022

  • curprev 07:0807:08, 3 July 2022DG Regio talk contribs 42,461 bytes +24,378 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 11:2611:26, 2 December 2021DG Regio talk contribs 14,146 bytes +1,158 Created claim: summary (P836): Hauptziel des Projekts ist die Verringerung der Energieintensität im Produktionsbetrieb von Pyrotek CZ, s.r.o. Gegenstand des Projekts ist die Modernisierung des bestehenden Tunnelofens Technochemica TSX/42/1500, um die Verbrennungs- und Zugverhältnisse des Tunnelofens zu optimieren und so die Steuerung des Heizsystems zu verfeinern., translated_summary
  • curprev 11:2611:26, 2 December 2021DG Regio talk contribs 12,988 bytes +125 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 19:1219:12, 28 November 2021DG Regio talk contribs 12,863 bytes +1,169 Created claim: summary (P836): L’objectif principal du projet est de réduire l’intensité énergétique dans l’exploitation de Pyrotek CZ, s.r.o. L’objet du projet est la modernisation du four tunnel existant Technochemica TSX/42/1500 afin d’optimiser les rapports de combustion et de traction du four tunnel et ainsi d’affiner le contrôle du système de chauffage., translated_summary
  • curprev 19:1219:12, 28 November 2021DG Regio talk contribs 11,694 bytes +136 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:4916:49, 22 October 2020DG Regio talk contribs 12,007 bytes +1,176 Created claim: summary (P836): The main objective of the project is to reduce energy performance in the production operation of PYROTEK CZ, s.r.o.. The object of the project is the modernisation of the existing tunnel furnace Technochemica TSX/42/1500 in order to optimise the combustion and thrust ratios of the tunnel kiln and therefore to refine the control of the heating system. a., translated_summary
  • curprev 16:4916:49, 22 October 2020DG Regio talk contribs 10,831 bytes −729 Removed claim: summary (P836): The main objective of the project is to reduce the energy performance of the production operations of Pyrotek CZ, s.r.o.. The purpose of the project is to upgrade the existing tunnel furnace Technochemica TSX/42/1500 in order to optimise combustion and tensile ratios of the tunnel furnace and, by extension, to refine the management of the heating system., remove_old_english_translation
  • curprev 08:5208:52, 22 October 2020DG Regio talk contribs 11,560 bytes +126 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 08:5208:52, 22 October 2020DG Regio talk contribs 11,434 bytes −126 Changed label, description and/or aliases in 1 language: remove_english_label

22 September 2020

16 July 2020

7 June 2020

26 March 2020

19 March 2020

25 February 2020

  • curprev 13:0113:01, 25 February 2020DG Regio talk contribs 10,285 bytes +729 Created claim: summary (P836): The main objective of the project is to reduce the energy performance of the production operations of Pyrotek CZ, s.r.o.. The purpose of the project is to upgrade the existing tunnel furnace Technochemica TSX/42/1500 in order to optimise combustion and tensile ratios of the tunnel furnace and, by extension, to refine the management of the heating system., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020