Revision history of "Reconstruction and insulation of the Hodoňovice building no. 100" (Q18444)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 05:5605:56, 10 October 2024DG Regio talk contribs 51,694 bytes −2 Changed label, description and/or aliases in pt
  • curprev 05:5605:56, 10 October 2024DG Regio talk contribs 51,696 bytes +10 Set a claim value: summary (P836): O objetivo do projeto é reforçar as capacidades de um novo grupo de crianças na aldeia de Baška, realizado sob a forma de reconstrução 2. NP e 3. PN do edifício n.o 100 em Hodoňovice (parte da aldeia de Baška). Ao mesmo tempo, haverá uma reconstrução abrangente, que não contamos com a ZV deste projeto. A reconstrução completa não pode ser subdividida de facto ou no tempo, é necessário realizá-la de uma só vez. Apenas incluímos a parte relativa ao gr...

7 March 2024

15 January 2024

12 June 2023

17 February 2023

3 July 2022

  • curprev 06:5606:56, 3 July 2022DG Regio talk contribs 49,012 bytes +28,156 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 11:0711:07, 2 December 2021DG Regio talk contribs 16,177 bytes +1,426 Created claim: summary (P836): Gegenstand des Projekts ist der Aufbau der Kapazität einer neuen Kindergruppe im Dorf Baška, die in Form von Wiederaufbau 2 durchgeführt wird. NP und 3. Gebäude NP 100 in Hodoňovice (Teil der Gemeinde Baška). Gleichzeitig wird eine umfassende Rekonstruktion durchgeführt, die wir für das ZV dieses Projekts nicht kosten. Die vollständige Rekonstruktion kann nicht in der Tat oder in der Zeit geteilt werden, es ist notwendig, es sofort zu tun. Wir n...
  • curprev 11:0711:07, 2 December 2021DG Regio talk contribs 14,751 bytes +122 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 19:0419:04, 28 November 2021DG Regio talk contribs 14,629 bytes +1,479 Created claim: summary (P836): Le projet a pour objet de renforcer les capacités d’un nouveau groupe d’enfants dans le village de Baška, réalisé sous forme de reconstruction 2. NP et 3. Bâtiment NP 100 à Hodoňovice (partie de la commune de Baška). Dans le même temps, une reconstruction globale sera réalisée, ce que nous ne coûtons pas à la ZV de ce projet. La reconstruction complète ne peut pas être divisée en fait ou dans le temps, il est nécessaire de le faire à la fois. No...
  • curprev 19:0419:04, 28 November 2021DG Regio talk contribs 13,150 bytes +118 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 17:0517:05, 22 October 2020DG Regio talk contribs 13,481 bytes +1,436 Created claim: summary (P836): The object of the project is to build the capacity of a new children’s group in the village of Baška carried out in the form of reconstruction 2. NP and 3. NP of building no. 100 in Hodoňovice (part of the village of Baška). At the same time, there will be a comprehensive reconstruction, which we do not count on the ZV of this project. The complete reconstruction cannot be subdivided in fact or in time, it is necessary to perform it at once. We...
  • curprev 17:0517:05, 22 October 2020DG Regio talk contribs 12,045 bytes −950 Removed claim: summary (P836): The project aims at building the capacity of a new child group in the municipality of Baška in the form of a reconstruction of 2. NP and 3. NA building n° 100 in Hodonín (part of the municipality of Baiška). This will take place at the same time as a comprehensive reconstruction, which is not included in the ZV of this project. Full refurbishment cannot be split in substance or time, and must be made at the same time. In the ZV, we only benefi...
  • curprev 08:3408:34, 22 October 2020DG Regio talk contribs 12,995 bytes +124 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 08:3408:34, 22 October 2020DG Regio talk contribs 12,871 bytes −113 Changed label, description and/or aliases in 1 language: remove_english_label

24 September 2020

21 September 2020

15 September 2020

28 August 2020

7 June 2020

25 March 2020

19 March 2020

25 February 2020

  • curprev 12:5812:58, 25 February 2020DG Regio talk contribs 11,199 bytes +950 Created claim: summary (P836): The project aims at building the capacity of a new child group in the municipality of Baška in the form of a reconstruction of 2. NP and 3. NA building n° 100 in Hodonín (part of the municipality of Baiška). This will take place at the same time as a comprehensive reconstruction, which is not included in the ZV of this project. Full refurbishment cannot be split in substance or time, and must be made at the same time. In the ZV, we only benefit...

17 February 2020

6 February 2020

30 January 2020

28 January 2020

10 January 2020