Revision history of "Reconstruction and superstructure Protected housing of St.Michael, Žabovřeská 69/6, Brno – Pisárky" (Q17850)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

15 January 2024

12 June 2023

17 February 2023

3 July 2022

  • curprev 06:1206:12, 3 July 2022DG Regio talk contribs 48,313 bytes +28,069 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 09:5409:54, 2 December 2021DG Regio talk contribs 15,629 bytes +1,389 Created claim: summary (P836): Das Projekt wird die Qualität der Wohnung verbessern und die Kapazität des St. Michael’s Protected Housing im Gebäude auf der Straße erhalten. Žabovřeská 69/6 in Brünn, durch einen kompletten Umbau des Gebäudes, den Bau eines 3NP-Oberbaus und eines barrierefreien Aufzugs. Der technische Zustand des Gebäudes und seine interne Anordnung, wo die Dienstleistung nun erbracht wird, sind in Bezug auf die Bedürfnisse der Kunden, die geplanten Rechtsvors...
  • curprev 09:5409:54, 2 December 2021DG Regio talk contribs 14,240 bytes +158 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:5618:56, 28 November 2021DG Regio talk contribs 14,082 bytes +1,414 Created claim: summary (P836): Le projet permettra d’améliorer la qualité du logement et de maintenir la capacité du logement protégé de St. Michael fourni dans l’immeuble de la rue. Žabovřeská 69/6 à Brno, grâce à une reconstruction complète du bâtiment, à la construction d’une superstructure 3NP et d’un ascenseur sans barrière. L’état technique du bâtiment et son aménagement interne, où le service est désormais fourni, sont insuffisants par rapport aux besoins des clients,...
  • curprev 18:5618:56, 28 November 2021DG Regio talk contribs 12,668 bytes +164 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 17:3417:34, 22 October 2020DG Regio talk contribs 12,953 bytes +1,363 Created claim: summary (P836): The project will improve the quality of housing and maintain the capacity of the Protected Housing of St. Michael provided in the building at ul. Žabovřeská 69/6 in Brno, through the overall reconstruction of the building, by building a superstructure of 3NP and a barrier-free lift. The technical state of the building and its internal layout, where the service is now provided, is inadequate in relation to the client’s needs, the planned legislat...
  • curprev 17:3417:34, 22 October 2020DG Regio talk contribs 11,590 bytes −947 Removed claim: summary (P836): The project will improve the quality of housing and the preservation of the capacity of the sheltered housing of St. Michael provided in the building on ul. 69/6 in Brno, by means of the general renovation of the building, the construction of the superstructure of the 3-NP and the barrier to being accessible. The technical condition of the building and its internal layout, where the service is now provided, is unsatisfactory in relation to the...
  • curprev 09:1209:12, 22 October 2020DG Regio talk contribs 12,537 bytes +164 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:1209:12, 22 October 2020DG Regio talk contribs 12,373 bytes −145 Changed label, description and/or aliases in 1 language: remove_english_label

21 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

25 February 2020

  • curprev 11:4611:46, 25 February 2020DG Regio talk contribs 10,723 bytes +947 Created claim: summary (P836): The project will improve the quality of housing and the preservation of the capacity of the sheltered housing of St. Michael provided in the building on ul. 69/6 in Brno, by means of the general renovation of the building, the construction of the superstructure of the 3-NP and the barrier to being accessible. The technical condition of the building and its internal layout, where the service is now provided, is unsatisfactory in relation to the n...

17 February 2020

6 February 2020

30 January 2020

28 January 2020

10 January 2020