Revision history of "Locksmith’s workshop – BSS area Mining STAVEBY COMMUNITY s.r.o." (Q17067)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

11 June 2023

17 February 2023

3 July 2022

  • curprev 05:1105:11, 3 July 2022DG Regio talk contribs 44,087 bytes +25,308 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 09:5209:52, 2 December 2021DG Regio talk contribs 14,521 bytes +1,260 Created claim: summary (P836): Das Projekt befasst sich mit der allgemeinen Revitalisierung und Energieeinsparungen im Bau der bestehenden Schlosserei aus den 1970er Jahren. Ziel der Maßnahme ist es, eine umfassende Isolierung der Außenhülle des Gebäudes zu realisieren, einschließlich des Austauschs aller äußeren Füllungen von Löchern, der Einführung eines neuen Zentralheizungssystems, der neuen Gasinstallation und der Installation einer neuen Wärmequelle., translated_summary
  • curprev 09:5209:52, 2 December 2021DG Regio talk contribs 13,261 bytes +128 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:5018:50, 28 November 2021DG Regio talk contribs 13,133 bytes +1,320 Created claim: summary (P836): Le projet porte sur la revitalisation globale et les économies d’énergie dans la construction de l’atelier de serrurier existant dans les années 1970. L’objectif de l’action est de mettre en œuvre une isolation complète de l’enveloppe extérieure du bâtiment, y compris le remplacement de tous les remplissages extérieurs de trous, la mise en place d’un nouveau système de chauffage central, une nouvelle installation de gaz et l’installation d’une n...
  • curprev 18:5018:50, 28 November 2021DG Regio talk contribs 11,813 bytes +130 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:3816:38, 22 October 2020DG Regio talk contribs 12,132 bytes +1,221 Created claim: summary (P836): The project solves overall revitalisation and energy savings in the building of the existing locksmith workshop from the s. The aim of the event is to perform complex insulation of the external envelope of the building including the replacement of all external fillings of the openings, the implementation of a new central heating system, new gas installation and installation of a new heat source. a., translated_summary
  • curprev 16:3816:38, 22 October 2020DG Regio talk contribs 10,911 bytes −757 Removed claim: summary (P836): The project addresses the overall revitalisation and energy savings of the building’s existing workshop from the 1970s. The purpose of the action is to carry out a complete insulation of the outer envelope of the building, including the replacement of all openings, to implement the new system of district heating, new gas installation and installation of a new source of the teplum., remove_old_english_translation
  • curprev 08:1508:15, 22 October 2020DG Regio talk contribs 11,668 bytes +126 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 08:1508:15, 22 October 2020DG Regio talk contribs 11,542 bytes −117 Changed label, description and/or aliases in 1 language: remove_english_label

22 September 2020

16 July 2020

7 June 2020

26 March 2020

19 March 2020

25 February 2020

  • curprev 12:0012:00, 25 February 2020DG Regio talk contribs 10,383 bytes +757 Created claim: summary (P836): The project addresses the overall revitalisation and energy savings of the building’s existing workshop from the 1970s. The purpose of the action is to carry out a complete insulation of the outer envelope of the building, including the replacement of all openings, to implement the new system of district heating, new gas installation and installation of a new source of the teplum., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020