Revision history of "Reduction of energy performance of objects DPMB, a.s. complex Slatina" (Q16993)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

11 June 2023

17 February 2023

3 July 2022

  • curprev 05:0905:09, 3 July 2022DG Regio talk contribs 47,590 bytes +27,922 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 09:4309:43, 2 December 2021DG Regio talk contribs 15,041 bytes +1,380 Created claim: summary (P836): Gegenstand des vorgestellten Projekts ist die Umsetzung energiesparender Maßnahmen im Zusammenhang mit der Revitalisierung der Ummantelung und teilweisen Austausch von Öffnungsfüllungen, Modernisierung des Wärmeverteilungs- und Beleuchtungssystems in den Räumlichkeiten des Depots Slatina der Firma Dopravní podnik der Stadt Brünn, a.s. Das Hauptziel des Projekts ist die Verringerung der Energieintensität im ausgewählten Firmengebäude. Alle umgese...
  • curprev 09:4309:43, 2 December 2021DG Regio talk contribs 13,661 bytes +124 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:4418:44, 28 November 2021DG Regio talk contribs 13,537 bytes +1,462 Created claim: summary (P836): L’objet du projet présenté est la mise en œuvre de mesures d’économie d’énergie liées à la revitalisation du caisson de périmètre et au remplacement partiel des garnitures d’ouverture, la modernisation du système de distribution de chaleur et d’éclairage dans les locaux du dépôt Slatina de la société Dopravní podnik de la ville de Brno, a.s. L’objectif principal du projet est de réduire l’intensité énergétique dans le bâtiment de l’entreprise sé...
  • curprev 18:4418:44, 28 November 2021DG Regio talk contribs 12,075 bytes +132 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:3716:37, 22 October 2020DG Regio talk contribs 12,392 bytes +1,346 Created claim: summary (P836): The subject of the submitted project is to implement energy-saving measures concerning the revitalisation of the outer shell and partial replacement of hole fillings, modernisation of heat distribution and lighting system in the premises of the Slatina depot of the company Dopravní podnik města Brna, a.s. The main objective of the project is to reduce energy performance in the selected building of the company. All measures implemented will lead...
  • curprev 16:3716:37, 22 October 2020DG Regio talk contribs 11,046 bytes −897 Removed claim: summary (P836): The subject of the present project is the implementation of energy-saving measures related to the revitalisation of the building envelope and the partial replacement of the building stock, modernisation of the distribution of heat and lighting systems at the company’s sole premises of the city of Brno, a.s. The main objective of the project is the reduction of energy intensity in the selected company’s premises. All the measures implemented wi...
  • curprev 08:1508:15, 22 October 2020DG Regio talk contribs 11,943 bytes +128 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 08:1508:15, 22 October 2020DG Regio talk contribs 11,815 bytes −102 Changed label, description and/or aliases in 1 language: remove_english_label

22 September 2020

16 July 2020

7 June 2020

26 March 2020

19 March 2020

25 February 2020

  • curprev 11:5911:59, 25 February 2020DG Regio talk contribs 10,639 bytes +897 Created claim: summary (P836): The subject of the present project is the implementation of energy-saving measures related to the revitalisation of the building envelope and the partial replacement of the building stock, modernisation of the distribution of heat and lighting systems at the company’s sole premises of the city of Brno, a.s. The main objective of the project is the reduction of energy intensity in the selected company’s premises. All the measures implemented will...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020