Revision history of "Building modifications of the industrial building of INVERA, s.r.o." (Q16913)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:2906:29, 9 October 2024DG Regio talk contribs 49,880 bytes −14 Changed label, description and/or aliases in pt
  • curprev 06:2906:29, 9 October 2024DG Regio talk contribs 49,894 bytes +27 Set a claim value: summary (P836): A implementação do projeto reduzirá significativamente o desempenho energético dos edifícios em que a empresa INVERA, s.r.o. opera. A envolvente externa dos edifícios será isolada, a reconstrução e a eficiência do sistema de aquecimento, a substituição dos orifícios de enchimento, a substituição do compressor e a distribuição de ar comprimido conexa, o ar condicionado e as modificações da cablagem. O projecto será realizado em construções nas st.p....

22 March 2024

15 January 2024

19 June 2023

11 June 2023

17 February 2023

3 July 2022

  • curprev 05:0705:07, 3 July 2022DG Regio talk contribs 46,171 bytes +26,906 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 09:4209:42, 2 December 2021DG Regio talk contribs 14,804 bytes +1,312 Created claim: summary (P836): Die Durchführung des Projekts wird die Energieeffizienz der Gebäude, in denen INVERA, s.r.o. tätig ist, erheblich verringern. Die Außenhülle der Gebäude wird isoliert, die Heizung wird rekonstruiert und gestrafft, die Öffnungsfüllungen ausgetauscht, der Kompressor ersetzt und die zugehörigen Druckluftverteilung, Klimaanlage und Verdrahtung werden durchgeführt. Das Projekt wird auf den Baustellen auf St.p. Nr. 4714 und 4715 k.ú durchgeführt. Rako...
  • curprev 09:4209:42, 2 December 2021DG Regio talk contribs 13,492 bytes +104 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:4918:49, 28 November 2021DG Regio talk contribs 13,388 bytes +1,403 Created claim: summary (P836): La mise en œuvre du projet réduira considérablement la performance énergétique des bâtiments dans lesquels INVERA, s.r.o. opère. L’enveloppe extérieure des bâtiments sera isolée, le système de chauffage est reconstruit et rationalisé, les remplissages d’ouverture sont remplacés, le compresseur est remplacé et les modifications associées à la distribution d’air comprimé, à la climatisation et au câblage seront effectuées. Le projet sera réalisé s...
  • curprev 18:4918:49, 28 November 2021DG Regio talk contribs 11,985 bytes +114 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:5716:57, 22 October 2020DG Regio talk contribs 12,320 bytes +1,338 Created claim: summary (P836): The implementation of the project will significantly reduce the energy performance of buildings in which the company INVERA, s.r.o. operates. The external envelope of the buildings will be insulated, reconstruction and efficiency of the heating system, replacement of hole fillings, replacement of compressor and related compressed air distribution, air conditioning and wiring modifications. The project will be realised on constructions at st.p. n...
  • curprev 16:5716:57, 22 October 2020DG Regio talk contribs 10,982 bytes −907 Removed claim: summary (P836): Implementation of the project will lead to a major improvement in the energy performance of buildings in which Invera is active. The insulation of the outer envelope for the buildings, the reconstruction and the streamlining of the heating system, the replacement of the filling, the exchange of the compressor and the related pressure air distribution, ventilation and electrical conditioning will be carried out. The project will be implemented...
  • curprev 08:1208:12, 22 October 2020DG Regio talk contribs 11,889 bytes +126 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 08:1208:12, 22 October 2020DG Regio talk contribs 11,763 bytes −114 Changed label, description and/or aliases in 1 language: remove_english_label

16 July 2020

7 June 2020

26 March 2020

19 March 2020

25 February 2020

  • curprev 11:5211:52, 25 February 2020DG Regio talk contribs 10,598 bytes +907 Created claim: summary (P836): Implementation of the project will lead to a major improvement in the energy performance of buildings in which Invera is active. The insulation of the outer envelope for the buildings, the reconstruction and the streamlining of the heating system, the replacement of the filling, the exchange of the compressor and the related pressure air distribution, ventilation and electrical conditioning will be carried out. The project will be implemented in...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020