Revision history of "Energy savings due to the use of photovoltaic system in company ŽALUZIE neva s.r.o." (Q16806)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:2104:21, 11 October 2024DG Regio talk contribs 47,908 bytes +3 Changed label, description and/or aliases in pt
  • curprev 04:2104:21, 11 October 2024DG Regio talk contribs 47,905 bytes −14 Set a claim value: summary (P836): O objetivo do projeto é a instalação de uma central fotovoltaica (FVE) sem acumulação de potência instalada de 165,9 kWp. Este FVE destina-se a produzir eletricidade e a fornecer toda a eletricidade produzida à rede da recorrente para consumo próprio. A contribuição do investimento destina-se a reduzir a poluição ambiental na produção da eletricidade necessária ao exercício das atividades da recorrente.

20 March 2024

15 January 2024

11 June 2023

20 February 2023

17 February 2023

3 July 2022

  • curprev 04:3804:38, 3 July 2022DG Regio talk contribs 45,715 bytes +26,668 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 09:4209:42, 2 December 2021DG Regio talk contribs 14,682 bytes +1,279 Created claim: summary (P836): Gegenstand des Projekts ist die Installation eines Photovoltaikkraftwerks (FVE) ohne Akkumulation mit einer installierten Leistung von 165,9 kWp. Diese PVE soll Strom erzeugen und den gesamten Strom liefern, der für seinen eigenen Produktionsverbrauch an das Netz der Klägerin erzeugt wird. Der Vorteil der Investition ist die Verringerung der Umweltverschmutzung bei der Stromerzeugung, die für den Betrieb der Tätigkeiten der Klägerin erforderlich...
  • curprev 09:4209:42, 2 December 2021DG Regio talk contribs 13,403 bytes +143 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:4418:44, 28 November 2021DG Regio talk contribs 13,260 bytes +1,317 Created claim: summary (P836): L’objet du projet est l’installation d’une centrale photovoltaïque (FVE) sans accumulation d’une capacité installée de 165,9 kWc. Ce PVE est conçu pour produire de l’électricité et fournir toute l’électricité produite au réseau de la requérante pour sa propre consommation de production. L’avantage de l’investissement est la réduction de la pollution de l’environnement dans la production d’électricité nécessaire à l’exploitation des activités du...
  • curprev 18:4418:44, 28 November 2021DG Regio talk contribs 11,943 bytes +163 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:5116:51, 22 October 2020DG Regio talk contribs 12,229 bytes +1,267 Created claim: summary (P836): The object of the project is the installation of a photovoltaic power plant (FVE) without accumulation of installed power of 165.9 kWp. This FVE is designed to generate electricity and supply all the electricity produced to the applicant’s grid for own production consumption. The contribution of the investment is to reduce environmental pollution in the production of electricity necessary for the operation of the applicant’s activities. a., tran...
  • curprev 16:5116:51, 22 October 2020DG Regio talk contribs 10,962 bytes −846 Removed claim: summary (P836): The project concerns the installation of a photovoltaic power plant (‘FVE’) without a build-up of 165,9 kWp installed. This FVE is designed for the production of energy and the supply of all the electricity produced to the distribution network of the applicant for its own production consumption. The benefit of the investment is the reduction of environmental pollution in the production of electrical energy necessary for the operation of the ap...
  • curprev 08:0408:04, 22 October 2020DG Regio talk contribs 11,808 bytes +143 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 08:0408:04, 22 October 2020DG Regio talk contribs 11,665 bytes −117 Changed label, description and/or aliases in 1 language: remove_english_label

22 September 2020

16 July 2020

7 June 2020

26 March 2020

25 February 2020

  • curprev 11:3311:33, 25 February 2020DG Regio talk contribs 10,493 bytes +846 Created claim: summary (P836): The project concerns the installation of a photovoltaic power plant (‘FVE’) without a build-up of 165,9 kWp installed. This FVE is designed for the production of energy and the supply of all the electricity produced to the distribution network of the applicant for its own production consumption. The benefit of the investment is the reduction of environmental pollution in the production of electrical energy necessary for the operation of the appl...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020