Revision history of "Installation of photovoltaic system in Solvent ČR, s.r.o." (Q16785)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:2806:28, 9 October 2024DG Regio talk contribs 44,460 bytes +3 Changed label, description and/or aliases in pt
  • curprev 06:2806:28, 9 October 2024DG Regio talk contribs 44,457 bytes +13 Set a claim value: summary (P836): O objetivo do projeto é a aquisição e subsequente instalação de uma central fotovoltaica de 183,6 kWp para o complexo de produtos farmacêuticos Solvent ČR. Este FVE destina-se a produzir eletricidade e a fornecer eletricidade à rede da recorrente para consumo próprio.

22 March 2024

15 January 2024

11 June 2023

17 February 2023

3 July 2022

  • curprev 04:3404:34, 3 July 2022DG Regio talk contribs 40,748 bytes +22,936 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 09:4209:42, 2 December 2021DG Regio talk contribs 13,968 bytes +1,124 Created claim: summary (P836): Gegenstand des Projekts ist der Erwerb und die anschließende Installation eines Photovoltaik-Kraftwerks mit einer Leistung von 183,6 kWp für den drogenbedingten Güterkomplex von SOLVENT ČR. Diese FVE soll Strom erzeugen und den erzeugten Strom zum eigenen Verbrauch an das Netz der Klägerin liefern., translated_summary
  • curprev 09:4209:42, 2 December 2021DG Regio talk contribs 12,844 bytes +117 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:4418:44, 28 November 2021DG Regio talk contribs 12,727 bytes +1,168 Created claim: summary (P836): Le projet a pour objet l’acquisition et l’installation ultérieure d’une centrale photovoltaïque d’une puissance de 183,6 kWc pour le complexe de biens liés à la drogue de SOLVENT ČR. Cette FVE est conçue pour produire de l’électricité et fournir l’électricité produite au réseau de la requérante pour sa propre consommation., translated_summary
  • curprev 18:4418:44, 28 November 2021DG Regio talk contribs 11,559 bytes +126 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:5116:51, 22 October 2020DG Regio talk contribs 11,882 bytes +1,093 Created claim: summary (P836): The object of the project is the acquisition and subsequent installation of a 183.6 kWp photovoltaic power plant for the Solvent ČR drug goods complex. This FVE is designed to generate electricity and supply electricity to the applicant’s network for own consumption. a., translated_summary
  • curprev 16:5116:51, 22 October 2020DG Regio talk contribs 10,789 bytes −637 Removed claim: summary (P836): The project concerns the purchase and subsequent installation of a 183,6 kWp PV plant for the drug site of Solvent CR. This FVE is designed for the production of energy and the supply of generated electricity to the grid of the applicant for its own consumption. a., remove_old_english_translation
  • curprev 08:0408:04, 22 October 2020DG Regio talk contribs 11,426 bytes +117 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 08:0408:04, 22 October 2020DG Regio talk contribs 11,309 bytes −110 Changed label, description and/or aliases in 1 language: remove_english_label

22 September 2020

16 July 2020

7 June 2020

25 March 2020

25 February 2020

  • curprev 11:3311:33, 25 February 2020DG Regio talk contribs 10,130 bytes +637 Created claim: summary (P836): The project concerns the purchase and subsequent installation of a 183,6 kWp PV plant for the drug site of Solvent CR. This FVE is designed for the production of energy and the supply of generated electricity to the grid of the applicant for its own consumption. a., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020