11 October 2024

  • curprev 04:2104:21, 11 October 2024DG Regio talk contribs 46,196 bytes −10 Changed label, description and/or aliases in pt
  • curprev 04:2104:21, 11 October 2024DG Regio talk contribs 46,206 bytes +3 Set a claim value: summary (P836): O objeto do projeto é a central fotovoltaica FVE, que será ligada à rede de distribuição à central elétrica principal existente RH, que está localizada na sala de distribuição principal do edifício.O sistema FV foi concebido na área de um telhado de sala de produção em dezasseis filas num número total de 336 painéis monocristalinos FV com saída nominal de painel individual de 295 Wp, divididos em oito cordas separadas. a.

12 March 2024

15 January 2024

11 June 2023

20 February 2023

17 February 2023

3 July 2022

  • curprev 04:3204:32, 3 July 2022DG Regio talk contribs 44,546 bytes +25,922 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 09:4209:42, 2 December 2021DG Regio talk contribs 14,458 bytes +1,251 Created claim: summary (P836): Gegenstand des Projekts ist ein Photovoltaik-Kraftwerk FVE, das an das Verteilernetz an die bestehende Hauptschalttafel RH angeschlossen wird, die sich im Hauptumspannwerk des Gebäudes befindet. Das FV-System ist auf der Fläche eines Daches der Produktionshalle in sechzehn Reihen in insgesamt 336 Stück FV monokristallinen Platten mit der Nennleistung des einzelnen Panels 295 Wp, aufgeteilt in acht separate Saiten, ausgelegt., translated_summary
  • curprev 09:4209:42, 2 December 2021DG Regio talk contribs 13,207 bytes +107 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:4318:43, 28 November 2021DG Regio talk contribs 13,100 bytes +1,261 Created claim: summary (P836): L’objet du projet est une centrale photovoltaïque FVE, qui sera raccordée au réseau de distribution au tableau principal RH existant, qui est situé dans la sous-station principale du bâtiment. Le système FV est conçu sur la zone d’un toit de la salle de production en seize rangées dans un total de 336 pcs de panneaux monocristallins FV avec la puissance nominale du panneau individuel 295 Wp, divisé en huit cordes séparées., translated_summary
  • curprev 18:4318:43, 28 November 2021DG Regio talk contribs 11,839 bytes +120 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:5116:51, 22 October 2020DG Regio talk contribs 12,168 bytes +1,251 Created claim: summary (P836): The object of the project is the photovoltaic power plant FVE, which will be connected to the distribution network to the existing main switchboard RH, which is located in the main distribution room of the building.FV system is designed on the area of one production hall roof in sixteen rows in a total number of 336 FV monocrystalline panels with nominal output of individual panel 295 Wp, divided into eight separate strings. a., translated_summary
  • curprev 16:5116:51, 22 October 2020DG Regio talk contribs 10,917 bytes −819 Removed claim: summary (P836): The subject of the project is the photovoltaic power plant, FVE, which will be connected to the distribution network in the existing main switchboard of the RH, which is located in the main distribution station in question. the system is designed for one roof of the production hall in sixteen series in succession in a total number of 336 FV mono-crystalline panels of rated output of an individual panel 295 Wp divided into eight separate units....
  • curprev 08:0408:04, 22 October 2020DG Regio talk contribs 11,736 bytes +122 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 08:0408:04, 22 October 2020DG Regio talk contribs 11,614 bytes −114 Changed label, description and/or aliases in 1 language: remove_english_label

24 September 2020

22 September 2020

16 July 2020

7 June 2020

25 March 2020

19 March 2020

25 February 2020

  • curprev 11:3211:32, 25 February 2020DG Regio talk contribs 10,464 bytes +819 Created claim: summary (P836): The subject of the project is the photovoltaic power plant, FVE, which will be connected to the distribution network in the existing main switchboard of the RH, which is located in the main distribution station in question. the system is designed for one roof of the production hall in sixteen series in succession in a total number of 336 FV mono-crystalline panels of rated output of an individual panel 295 Wp divided into eight separate units.,...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020