Revision history of "CONSTRUCTION OF E.ON’S FVE – COMPLEX BRNO CEJL – BUILDING FGH AND GARAGE" (Q16737)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

7 March 2024

15 January 2024

11 June 2023

17 February 2023

3 July 2022

  • curprev 04:2604:26, 3 July 2022DG Regio talk contribs 40,402 bytes +22,893 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 09:3809:38, 2 December 2021DG Regio talk contribs 13,865 bytes +1,132 Created claim: summary (P836): Bei der Durchführung des eingereichten Projekts handelt es sich um die Installation von PVE mit einer installierten Kapazität von 34,65kWp, die auf dem Dach des entworfenen Gebäudes platziert ist, und die Speicherung von Strom mit einer Nennkapazität von 55,2 kWh für den Eigenverbrauch des Antragstellers., translated_summary
  • curprev 09:3809:38, 2 December 2021DG Regio talk contribs 12,733 bytes +117 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:4218:42, 28 November 2021DG Regio talk contribs 12,616 bytes +1,095 Created claim: summary (P836): La mise en œuvre du projet soumis consiste en l’installation de PVE d’une capacité installée de 34,65 kWp, placée sur le toit du bâtiment conçu, et le stockage d’électricité d’une capacité nominale de 55,2 kWh, pour la consommation propre de la requérante., translated_summary
  • curprev 18:4218:42, 28 November 2021DG Regio talk contribs 11,521 bytes +125 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:3916:39, 22 October 2020DG Regio talk contribs 11,845 bytes +1,080 Created claim: summary (P836): Implementation of the submitted project consists of installing the FVE with installed power of 34,65kWp, placed on the roof of the designed building, and accumulation of electricity with a nominal capacity of 55.2 kWh, for the applicant’s own consumption. a., translated_summary
  • curprev 16:3916:39, 22 October 2020DG Regio talk contribs 10,765 bytes −634 Removed claim: summary (P836): The implementation of the present project consists of the installation of the FVE with the installed capacity of 34,65kWp, placed on the roof of the solution and the electricity storage with a nominal capacity of 55.2 kWh, for the applicant’s own consumption., remove_old_english_translation
  • curprev 08:0008:00, 22 October 2020DG Regio talk contribs 11,399 bytes +137 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 08:0008:00, 22 October 2020DG Regio talk contribs 11,262 bytes −134 Changed label, description and/or aliases in 1 language: remove_english_label

24 September 2020

22 September 2020

16 July 2020

7 June 2020

25 March 2020

25 February 2020

  • curprev 11:3811:38, 25 February 2020DG Regio talk contribs 10,117 bytes +634 Created claim: summary (P836): The implementation of the present project consists of the installation of the FVE with the installed capacity of 34,65kWp, placed on the roof of the solution and the electricity storage with a nominal capacity of 55.2 kWh, for the applicant’s own consumption., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020