Revision history of "Installation of photovoltaic power plant with battery system and necessary modifications of electrical distributions in ZOD Tísek" (Q16698)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

6 July 2023

11 June 2023

20 February 2023

17 February 2023

3 July 2022

  • curprev 04:1904:19, 3 July 2022DG Regio talk contribs 49,717 bytes +29,287 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 09:3709:37, 2 December 2021DG Regio talk contribs 15,432 bytes +1,455 Created claim: summary (P836): Installation eines Photovoltaik-Kraftwerks mit einer Leistung von 50 kWp auf dem Dach des Verwaltungsgebäudes ZOD Tísek und gleichzeitig auf dem Dach von Werkstätten mit einem Batteriesystem mit einer Leistung von 28 kWh zur Akkumulation des im Dachgeschoss des Verwaltungsgebäudes erzeugten Stroms und der notwendigen Modifikationen der elektrischen Verkabelung im Verwaltungsgebäude – Werkstätten, Nacherntenleitungen und Modifikationen der Rückgr...
  • curprev 09:3709:37, 2 December 2021DG Regio talk contribs 13,977 bytes +189 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:4318:43, 28 November 2021DG Regio talk contribs 13,788 bytes +1,497 Created claim: summary (P836): Installation d’une centrale photovoltaïque d’une puissance de 50 kWp sur le toit du bâtiment administratif ZOD Tísek et simultanément sur le toit des ateliers avec un système de batteries d’une capacité de 28 kWh pour l’accumulation de l’électricité produite dans le grenier du bâtiment administratif et les modifications nécessaires du câblage électrique dans le bâtiment administratif — ateliers, lignes post-récolte et modifications de la distrib...
  • curprev 18:4318:43, 28 November 2021DG Regio talk contribs 12,291 bytes +199 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:3916:39, 22 October 2020DG Regio talk contribs 12,541 bytes +1,412 Created claim: summary (P836): Installation of a photovoltaic power plant with an output of 50 kWp on the roof of the administrative building ZOD Tísek and simultaneously on the roof of the workshops with a battery system of 28 kWh for the accumulation of electricity produced in the attic of the administrative building and necessary modifications of electrical distribution in the administrative building – workshops, post-harvest line and modifications of the backbone distribu...
  • curprev 16:3916:39, 22 October 2020DG Regio talk contribs 11,129 bytes −961 Removed claim: summary (P836): Installation of a 50 kWp power station on the roof of the administrative object of the ZFROM Tísek and, at the same time, on the roof of workshops with a battery capacity of 28 kWh, to accumulate the generated electricity located within the understep administrative structure and the necessary modifications to the wiring of an administrative building — workshops, poharvest line and alterations to the trunk distribution of electricity at the Zno...
  • curprev 08:0008:00, 22 October 2020DG Regio talk contribs 12,090 bytes +190 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 08:0008:00, 22 October 2020DG Regio talk contribs 11,900 bytes −204 Changed label, description and/or aliases in 1 language: remove_english_label

22 September 2020

16 July 2020

7 June 2020

25 March 2020

25 February 2020

  • curprev 11:3711:37, 25 February 2020DG Regio talk contribs 10,815 bytes +961 Created claim: summary (P836): Installation of a 50 kWp power station on the roof of the administrative object of the ZFROM Tísek and, at the same time, on the roof of workshops with a battery capacity of 28 kWh, to accumulate the generated electricity located within the understep administrative structure and the necessary modifications to the wiring of an administrative building — workshops, poharvest line and alterations to the trunk distribution of electricity at the Znojm...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020