Revision history of "HFVE De-Wood a.s., Uničov" (Q16643)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:3318:33, 9 October 2024DG Regio talk contribs 48,129 bytes +6 Set a claim value: summary (P836): O objetivo do projeto é a instalação de um sistema fotovoltaico com potência instalada de 446,31 kWp, ou seja, com capacidade de armazenamento de energia e capacidade de acumulação de 203,55 kWh. Os painéis estarão em ligação em série paralela nos telhados dos edifícios industriais existentes nas instalações da empresa.A De-Wood a.s. tem um contrato para a ligação de equipamentos para a produção e consumo de eletricidade na rede de distribuição a pa...

23 March 2024

15 January 2024

11 June 2023

20 February 2023

17 February 2023

3 July 2022

  • curprev 04:0904:09, 3 July 2022DG Regio talk contribs 46,472 bytes +27,308 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 09:3609:36, 2 December 2021DG Regio talk contribs 14,785 bytes +1,443 Created claim: summary (P836): Gegenstand des Projekts ist die Installation einer Photovoltaikanlage mit einer installierten Leistung von 446,31 kWp, d. h. mit Energiespeicherung und einer Speicherkapazität von 203,55 kWh. Die Paneele werden auf den Dächern bestehender Industriegebäude im Firmengelände serienmäßig miteinander verbunden sein. De-Wood a.s. hat mit dem Verteilernetzbetreiber ČEZ Distribuce, a.s. mit dem Verteilernetzbetreiber ČEZ Distribuce, a.s. einen Vertrag ü...
  • curprev 09:3609:36, 2 December 2021DG Regio talk contribs 13,342 bytes +85 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:4218:42, 28 November 2021DG Regio talk contribs 13,257 bytes +1,297 Created claim: summary (P836): Le projet a pour objet l’installation d’un système photovoltaïque d’une puissance installée de 446,31 kWp, c’est-à-dire avec stockage d’énergie et capacité de stockage de 203,55 kWh. De-Wood a.s. a conclu un contrat de raccordement d’équipements pour la production et la consommation d’électricité dans le réseau de distribution à partir du niveau haute tension no 17_VN_1008402809 avec le gestionnaire de réseau de distribution ČEZ Distribuce, a.s....
  • curprev 18:4218:42, 28 November 2021DG Regio talk contribs 11,960 bytes +85 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:4416:44, 22 October 2020DG Regio talk contribs 12,324 bytes +1,381 Created claim: summary (P836): The object of the project is the installation of a photovoltaic system with installed output of 446.31 kWp, i.e. with energy storage capacity and 203.55 kWh accumulation capacity. The panels will be in series-parallel connection on the roofs of existing industrial buildings on the company premises.De-Wood a.s. has a contract for connection of equipment for the production and consumption of electricity in the distribution system from the voltage...
  • curprev 16:4416:44, 22 October 2020DG Regio talk contribs 10,943 bytes −834 Removed claim: summary (P836): The project concerns the installation of a photovoltaic system with a installed capacity of 446,31 kWp, i.e. with an energy storage capacity and a storage capacity of 203.55 kWh. A contract for the connection of generation and off-take of electricity in the distribution system with the distribution system operator of ČEZ Distribuce, a.s. is a contract for the connection of generation and off-take of electricity from the grid system of ČEZ Dist...
  • curprev 07:5507:55, 22 October 2020DG Regio talk contribs 11,777 bytes +85 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 07:5507:55, 22 October 2020DG Regio talk contribs 11,692 bytes −86 Changed label, description and/or aliases in 1 language: remove_english_label

24 September 2020

22 September 2020

16 July 2020

7 June 2020

25 March 2020

19 March 2020

25 February 2020

  • curprev 11:2811:28, 25 February 2020DG Regio talk contribs 10,504 bytes +834 Created claim: summary (P836): The project concerns the installation of a photovoltaic system with a installed capacity of 446,31 kWp, i.e. with an energy storage capacity and a storage capacity of 203.55 kWh. A contract for the connection of generation and off-take of electricity in the distribution system with the distribution system operator of ČEZ Distribuce, a.s. is a contract for the connection of generation and off-take of electricity from the grid system of ČEZ Distri...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020