Revision history of "Extension of roof FVE at H.R.G. spol. s r.o." (Q16637)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 16:4116:41, 10 October 2024DG Regio talk contribs 45,882 bytes +3 Set a claim value: summary (P836): O objetivo do projeto é aumentar a eficiência de operação através da redução da eletricidade consumida classicamente, graças ao aumento da produção própria da usina fotovoltaica instalada estendida. A produção do FVE será aumentada em 298,1 kWp, o que contribuirá para a poupança anual de consumo de energia final em 286,8 MWh.

22 March 2024

15 January 2024

11 June 2023

17 February 2023

3 July 2022

  • curprev 04:0804:08, 3 July 2022DG Regio talk contribs 43,207 bytes +24,144 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 11:0711:07, 2 December 2021DG Regio talk contribs 15,162 bytes +1,186 Created claim: summary (P836): Gegenstand des Projekts ist es, die Wirtschaftlichkeit des Betriebs zu erhöhen, indem der klassische Stromverbrauch dank der gestiegenen Eigenproduktion aus dem erweiterten installierten Photovoltaik-Kraftwerk reduziert wird. Die Leistung des PVE wird um 298,1 kWp erhöht, was zu einer jährlichen Einsparung von 286,8 MWh des Endenergieverbrauchs beitragen wird., translated_summary
  • curprev 11:0711:07, 2 December 2021DG Regio talk contribs 13,976 bytes +108 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:4318:43, 28 November 2021DG Regio talk contribs 13,868 bytes +1,216 Created claim: summary (P836): L’objet du projet est d’accroître le rapport coût-efficacité de l’exploitation en réduisant la consommation d’électricité classique, grâce à l’augmentation de la production propre de la centrale photovoltaïque installée agrandie. La production du PVE sera augmentée de 298,1 kWc, ce qui contribuera à une économie annuelle de 286,8 MWh de consommation finale d’énergie., translated_summary
  • curprev 18:4318:43, 28 November 2021DG Regio talk contribs 12,652 bytes +105 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:4416:44, 22 October 2020DG Regio talk contribs 12,996 bytes +1,169 Created claim: summary (P836): The object of the project is to increase the efficiency of operation by reducing the electricity consumed classically, thanks to increased own production from the extended installed photovoltaic power plant. The output of the FVE will be increased by 298.1 kWp, which will contribute to the annual saving of final energy consumption by 286.8 MWh. a., translated_summary
  • curprev 16:4416:44, 22 October 2020DG Regio talk contribs 11,827 bytes −734 Removed claim: summary (P836): The purpose of the project is to increase the efficiency of the operation by reducing the quantity of electricity generated by the conventional route, thanks to increased production from the large installed photovoltaic power plant. There will be an increase in the performance of FVE by 298,1 kWp, which contributes to annual final energy savings of 286,8 MWth., remove_old_english_translation
  • curprev 07:5407:54, 22 October 2020DG Regio talk contribs 12,561 bytes +103 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 07:5407:54, 22 October 2020DG Regio talk contribs 12,458 bytes −131 Changed label, description and/or aliases in 1 language: remove_english_label

24 September 2020

22 September 2020

16 July 2020

7 June 2020

25 March 2020

25 February 2020

  • curprev 11:2711:27, 25 February 2020DG Regio talk contribs 11,301 bytes +734 Created claim: summary (P836): The purpose of the project is to increase the efficiency of the operation by reducing the quantity of electricity generated by the conventional route, thanks to increased production from the large installed photovoltaic power plant. There will be an increase in the performance of FVE by 298,1 kWp, which contributes to annual final energy savings of 286,8 MWth., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020