  • curprev 15:5315:53, 7 October 2024DG Regio talk contribs 45,704 bytes +2 Set a claim value: summary (P836): O projeto inclui a construção de uma central fotovoltaica com uma potência de 48,6 kWp no telhado da unidade de produção em Rychnov nad Kněžnou. O objetivo deste projeto é reduzir o consumo final de eletricidade utilizada na produção de metais e substituí-la pela sua própria produção de eletricidade a partir de uma fonte renovável.

22 March 2024

15 January 2024

19 June 2023

11 June 2023

17 February 2023

3 July 2022

  • curprev 04:0004:00, 3 July 2022DG Regio talk contribs 42,006 bytes +24,024 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 11:0511:05, 2 December 2021DG Regio talk contribs 14,081 bytes +1,146 Created claim: summary (P836): Das Projekt umfasst den Bau eines Photovoltaikkraftwerks mit einer Leistung von 48,6 kWp auf dem Dach der Produktionsanlage in Rychnov nad Kněžnou. Ziel dieses Projekts ist es, den Endverbrauch an in der Metallproduktion verbrauchtem Strom zu senken und durch eine eigene Stromerzeugung aus erneuerbaren Quellen zu ersetzen., translated_summary
  • curprev 11:0511:05, 2 December 2021DG Regio talk contribs 12,935 bytes +114 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:4218:42, 28 November 2021DG Regio talk contribs 12,821 bytes +1,209 Created claim: summary (P836): Le projet consiste en la construction d’une centrale photovoltaïque d’une puissance de 48,6 kWc sur le toit de l’usine de production de Rychnov nad Kněžnou. L’objectif de ce projet est de réduire la consommation finale d’électricité utilisée dans la production de métaux et de la remplacer par sa propre production d’électricité à partir d’une source renouvelable., translated_summary
  • curprev 18:4218:42, 28 November 2021DG Regio talk contribs 11,612 bytes +114 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:4116:41, 22 October 2020DG Regio talk contribs 11,947 bytes +1,160 Created claim: summary (P836): The project includes the construction of a photovoltaic power plant with an output of 48.6 kWp on the roof of the production plant in Rychnov nad Kněžnou. The aim of this project is to reduce the final consumption of electricity used in metal production and to replace it with its own production of electricity from a renewable source. a., translated_summary
  • curprev 16:4116:41, 22 October 2020DG Regio talk contribs 10,787 bytes −688 Removed claim: summary (P836): The project involves the construction of a 48,6 kWp power plant on the roof of a production site in Rychnov nad Kněžnou. The objective of this project is to reduce the final consumption of electrical energy used in the metal production and to replace it by its own production of electricity from renewable sources., remove_old_english_translation
  • curprev 07:5407:54, 22 October 2020DG Regio talk contribs 11,475 bytes +114 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 07:5407:54, 22 October 2020DG Regio talk contribs 11,361 bytes −92 Changed label, description and/or aliases in 1 language: remove_english_label

24 September 2020

22 September 2020

16 July 2020

7 June 2020

25 March 2020

19 March 2020

25 February 2020

  • curprev 11:2711:27, 25 February 2020DG Regio talk contribs 10,181 bytes +688 Created claim: summary (P836): The project involves the construction of a 48,6 kWp power plant on the roof of a production site in Rychnov nad Kněžnou. The objective of this project is to reduce the final consumption of electrical energy used in the metal production and to replace it by its own production of electricity from renewable sources., Adding English summary