Revision history of "FVE – Louny" (Q16607)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:2104:21, 11 October 2024DG Regio talk contribs 42,909 bytes 0 Changed label, description and/or aliases in pt
  • curprev 04:2104:21, 11 October 2024DG Regio talk contribs 42,909 bytes −5 Set a claim value: summary (P836): O projecto tem por objecto a construção de uma central fotovoltaica com uma potência de cerca de 55 kWp. A central fotovoltaica estará localizada no telhado do edifício da empresa em Louny. Toda a energia produzida será consumida no ponto de produção sem extravasamentos para o sistema de distribuição. a.

22 March 2024

19 June 2023

11 June 2023

1 June 2023

17 February 2023

3 July 2022

  • curprev 03:5903:59, 3 July 2022DG Regio talk contribs 39,864 bytes +22,464 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 11:0611:06, 2 December 2021DG Regio talk contribs 13,783 bytes +1,118 Created claim: summary (P836): Gegenstand des Projekts ist der Bau eines Photovoltaik-Kraftwerks mit einer Leistung von ca. 55 kWp. Das Photovoltaik-Kraftwerk befindet sich auf dem Dach des Unternehmensgebäudes in Louny. Die gesamte erzeugte Energie wird am Produktionsstandort ohne Überflüsse in das Verteilernetz verbraucht., translated_summary
  • curprev 11:0611:06, 2 December 2021DG Regio talk contribs 12,665 bytes +72 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:4218:42, 28 November 2021DG Regio talk contribs 12,593 bytes +1,143 Created claim: summary (P836): L’objet du projet est la construction d’une centrale photovoltaïque d’une puissance d’environ 55 kWc. La centrale photovoltaïque sera située sur le toit du bâtiment de la société à Louny. Toute l’énergie produite sera consommée sur le site de production sans débordement vers le réseau de distribution., translated_summary
  • curprev 18:4218:42, 28 November 2021DG Regio talk contribs 11,450 bytes +72 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:4116:41, 22 October 2020DG Regio talk contribs 11,827 bytes +1,143 Created claim: summary (P836): The object of the project is the construction of a photovoltaic power plant with an output of approximately 55 kWp. The photovoltaic power plant will be located on the roof of the company’s building in Louny. All energy produced will be consumed at the point of production without overflows to the distribution system. a., translated_summary
  • curprev 16:4116:41, 22 October 2020DG Regio talk contribs 10,684 bytes −698 Removed claim: summary (P836): The purpose of the project is the construction of a photovoltaic power plant with a power of approximately 55 kWp. The photovoltaic power plant will be located on the roof of the building of the Louny company. All the energy produced will be consumed at the production site, free of the overflows into the distribution system., remove_old_english_translation
  • curprev 07:5407:54, 22 October 2020DG Regio talk contribs 11,382 bytes +72 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 07:5407:54, 22 October 2020DG Regio talk contribs 11,310 bytes −72 Changed label, description and/or aliases in 1 language: remove_english_label

22 September 2020

16 July 2020

7 June 2020

25 March 2020

25 February 2020

  • curprev 11:2711:27, 25 February 2020DG Regio talk contribs 10,093 bytes +698 Created claim: summary (P836): The purpose of the project is the construction of a photovoltaic power plant with a power of approximately 55 kWp. The photovoltaic power plant will be located on the roof of the building of the Louny company. All the energy produced will be consumed at the production site, free of the overflows into the distribution system., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020