Revision history of "Installation of photovoltaic power plant on Synot Auto a.s." (Q16579)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:5118:51, 8 October 2024DG Regio talk contribs 47,363 bytes +2 Changed label, description and/or aliases in pt
  • curprev 18:5118:51, 8 October 2024DG Regio talk contribs 47,361 bytes +22 Set a claim value: summary (P836): O objetivo do projeto apresentado é instalar um novo FVE (sem acumulação) e a sua ligação à cablagem da Synot Auto a.s. A central elétrica será construída no telhado do edifício e consistirá em 164 painéis monocristalinos fotovoltaicos com uma potência de 327 Wp. A potência total instalada do FVE será de 53.628 kWp. O projeto apresentado permitirá ao candidato obter uma poupança de custos de aproximadamente 125,2 mil. CZK/ano. a.

12 March 2024

15 January 2024

19 June 2023

11 June 2023

20 February 2023

17 February 2023

3 July 2022

  • curprev 03:5503:55, 3 July 2022DG Regio talk contribs 45,139 bytes +25,996 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 11:0411:04, 2 December 2021DG Regio talk contribs 14,731 bytes +1,358 Created claim: summary (P836): Gegenstand des vorgestellten Projekts ist die Installation eines neuen PVE (ohne Akkumulation) und dessen Anschluss an die elektrische Installation des Synot Auto a.s.-Gebäudes. Das Kraftwerk wird auf dem Dach des Gebäudes gebaut und besteht aus 164 Stück photovoltaischen monokristallinen Platten mit einer Kapazität von 327 Wp. Die installierte Gesamtleistung des FVE beträgt 53.628 kWp. Das vorgeschlagene Projekt wird es dem Antragsteller ermögl...
  • curprev 11:0411:04, 2 December 2021DG Regio talk contribs 13,373 bytes +119 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:4518:45, 28 November 2021DG Regio talk contribs 13,254 bytes +1,350 Created claim: summary (P836): L’objet du projet présenté est l’installation d’un nouveau PVE (sans accumulation) et sa connexion à l’installation électrique du bâtiment Synot Auto a.s.. La centrale électrique sera construite sur le toit du bâtiment et se composera de 164 pièces de panneaux monocristallins photovoltaïques d’une capacité de 327 Wp. La puissance totale installée de la FVE sera de 53 628 kWc. Le projet proposé permettra au demandeur de réaliser une économie de c...
  • curprev 18:4518:45, 28 November 2021DG Regio talk contribs 11,904 bytes +124 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:4116:41, 22 October 2020DG Regio talk contribs 12,229 bytes +1,271 Created claim: summary (P836): The object of the submitted project is to install a new FVE (without accumulation) and its connection to the wiring of Synot Auto a.s. The power plant will be built on the roof of the building and will consist of 164 photovoltaic monocrystalline panels with an output of 327 Wp. The total installed power of FVE will be 53.628 kWp. The submitted project will enable the applicant to achieve a cost savings of approximately 125,2 thousand. CZK/year....
  • curprev 16:4116:41, 22 October 2020DG Regio talk contribs 10,958 bytes −850 Removed claim: summary (P836): The purpose of the proposed project is the installation of a new FVE (without accumulation) and its connection to the electrical installation of the premises of Synot Auto a.s. Elektrárna will be built on the roof of the building and will consist of 164 units of photovoltaic mono-crystalline panels with a power of 327 Wp. The total installed power of FVE will be 53,628 kWp. The proposed project will enable the applicant to achieve cost savings...
  • curprev 07:5407:54, 22 October 2020DG Regio talk contribs 11,808 bytes +118 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 07:5407:54, 22 October 2020DG Regio talk contribs 11,690 bytes −136 Changed label, description and/or aliases in 1 language: remove_english_label

24 September 2020

22 September 2020

16 July 2020

7 June 2020

25 March 2020

19 March 2020

25 February 2020

  • curprev 11:2611:26, 25 February 2020DG Regio talk contribs 10,554 bytes +850 Created claim: summary (P836): The purpose of the proposed project is the installation of a new FVE (without accumulation) and its connection to the electrical installation of the premises of Synot Auto a.s. Elektrárna will be built on the roof of the building and will consist of 164 units of photovoltaic mono-crystalline panels with a power of 327 Wp. The total installed power of FVE will be 53,628 kWp. The proposed project will enable the applicant to achieve cost savings o...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020