Revision history of "Energy Savings Private High School for Marketing and Business Economy" (Q16546)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:2104:21, 11 October 2024DG Regio talk contribs 50,379 bytes +3 Changed label, description and/or aliases in pt
  • curprev 04:2104:21, 11 October 2024DG Regio talk contribs 50,376 bytes −2 Set a claim value: summary (P836): O objetivo do projeto são medidas de poupança de energia dos edifícios SSŠMEP em Most. Há quatro edifícios ligados pelo átrio, que servem a escola e são as instalações para Junák e Scout. Serão realizadas as seguintes obras de construção: Isolamento das paredes exteriores, cobertura do telhado e piso PDL3, o preenchimento dos orifícios será substituído por janelas e portas com vidro duplo isolante e armação de plástico. A vigilância energética será...

22 March 2024

15 January 2024

19 June 2023

11 June 2023

20 February 2023

17 February 2023

3 July 2022

  • curprev 03:5103:51, 3 July 2022DG Regio talk contribs 48,720 bytes +28,829 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 11:0811:08, 2 December 2021DG Regio talk contribs 15,201 bytes +1,394 Created claim: summary (P836): Gegenstand des Projekts sind energiesparende Maßnahmen der SSŠMEP-Gebäude in Most. Dies sind vier Gebäude, die durch ein Atrium verbunden sind, das der Schule dient und ein Hintergrund für Junák und Skaut ist. Folgende Bauarbeiten werden durchgeführt: Die Isolierung von Peripheriewänden, Dachbelägen und PDL3-Fußböden wird durch Fenster und Türen mit Isolierdoppelverglasung und Kunststoffrahmen ersetzt. Die Energieüberwachung wird eingeführt. Zie...
  • curprev 11:0811:08, 2 December 2021DG Regio talk contribs 13,807 bytes +128 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:4318:43, 28 November 2021DG Regio talk contribs 13,679 bytes +1,473 Created claim: summary (P836): Le projet porte sur les mesures d’économie d’énergie des bâtiments SSŠMEP de Most. Il s’agit de quatre bâtiments reliés par un atrium, qui desservent l’école et constituent un arrière-plan pour Junák et Skaut. Les travaux de construction suivants seront réalisés: L’isolation des murs périphériques, des revêtements de toiture et des sols PDL3 sera remplacée par des fenêtres et des portes avec double vitrage isolant et cadre en plastique. Une surv...
  • curprev 18:4318:43, 28 November 2021DG Regio talk contribs 12,206 bytes +157 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:2916:29, 22 October 2020DG Regio talk contribs 12,498 bytes +1,393 Created claim: summary (P836): The object of the project is energy saving measures of SSŠMEP buildings in Most. There are four buildings connected by the atrium, which serve the school and are the facilities for Junák and Scout. The following construction works will be carried out: Insulation of the outer walls, roof cover and floor PDL3, the filling of the holes will be replaced by windows and doors with insulating double glass and plastic frame. Energy surveillance will be...
  • curprev 16:2916:29, 22 October 2020DG Regio talk contribs 11,105 bytes −908 Removed claim: summary (P836): The purpose of the project is the energy-saving measures of the SŠMEP buildings in Mostu. The four buildings are connected by the atrium, which is used by the school and is the house of Junak and skaut. The following works will be carried out: The insulation of the building walls, roof coats and floor PDL3 shall be replaced by windows and doors with insulating double glass and plastic frames. Energy supervision will be introduced. The project...
  • curprev 09:1409:14, 22 October 2020DG Regio talk contribs 12,013 bytes +128 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:1409:14, 22 October 2020DG Regio talk contribs 11,885 bytes −149 Changed label, description and/or aliases in 1 language: remove_english_label

16 July 2020

7 June 2020

25 March 2020

25 February 2020

  • curprev 11:1111:11, 25 February 2020DG Regio talk contribs 10,743 bytes +908 Created claim: summary (P836): The purpose of the project is the energy-saving measures of the SŠMEP buildings in Mostu. The four buildings are connected by the atrium, which is used by the school and is the house of Junak and skaut. The following works will be carried out: The insulation of the building walls, roof coats and floor PDL3 shall be replaced by windows and doors with insulating double glass and plastic frames. Energy supervision will be introduced. The project ai...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020