Revision history of "Energy savings of buildings of the company Dítě logistic s.r.o. Hradec Králové – storage hall" (Q16468)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

19 June 2023

11 June 2023

20 February 2023

17 February 2023

3 July 2022

  • curprev 03:4803:48, 3 July 2022DG Regio talk contribs 44,877 bytes +26,020 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 11:0611:06, 2 December 2021DG Regio talk contribs 15,476 bytes +1,250 Created claim: summary (P836): Ziel des Projekts ist es, in den Lagerhallen von Dítě Logistics s.r.o. energiesparende Maßnahmen (Isolierung von Perimeterwänden, Dachkonstruktionen und Ersatz von Lochfüllungen) umzusetzen. Dank dieser Maßnahmen werden Energieeinsparungen in den Räumlichkeiten des Unternehmens, die wirtschaftliche Intensität des Betriebs der Räumlichkeiten und eine deutliche Verringerung der Schadstoffemissionen in die Luft erreicht., translated_summary
  • curprev 11:0611:06, 2 December 2021DG Regio talk contribs 14,226 bytes +150 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:4418:44, 28 November 2021DG Regio talk contribs 14,076 bytes +1,294 Created claim: summary (P836): L’objectif du projet est de mettre en œuvre des mesures d’économie d’énergie (isolation des murs de périmètre, structures de toit et remplacement des obturations de trous) dans les salles de stockage de Dítě Logistics s.r.o. Grâce à ces mesures, des économies d’énergie seront réalisées dans les locaux de l’entreprise, l’intensité économique de l’exploitation des locaux et une réduction significative des émissions de polluants dans l’air., transl...
  • curprev 18:4418:44, 28 November 2021DG Regio talk contribs 12,782 bytes +165 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:2516:25, 22 October 2020DG Regio talk contribs 13,070 bytes +1,206 Created claim: summary (P836): The aim of the project is to implement energy-saving measures (insulated circuit walls, roof structures and replacement of hole fillings) in the storage halls of Dítě logistic s.r.o. Thanks to these measures, energy savings will occur in the company’s premises, reduce the economic intensity of operation of the complex and significantly reduce emissions of pollutants into the air., translated_summary
  • curprev 16:2516:25, 22 October 2020DG Regio talk contribs 11,864 bytes −768 Removed claim: summary (P836): The aim of the project is to implement energy-saving measures (insulation of wall walls, roof structures and replacement of) in the storage halls of the company’s logistics of the company’s logistics. these measures will generate energy savings on the firm’s premises, reduce the economic cost of running the complex and significantly reduce the emissions of pollutants into the atmosphere., remove_old_english_translation
  • curprev 09:1309:13, 22 October 2020DG Regio talk contribs 12,632 bytes +158 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:1309:13, 22 October 2020DG Regio talk contribs 12,474 bytes −162 Changed label, description and/or aliases in 1 language: remove_english_label

15 July 2020

19 June 2020

7 June 2020

25 March 2020

3 March 2020

25 February 2020

  • curprev 11:1011:10, 25 February 2020DG Regio talk contribs 10,935 bytes +768 Created claim: summary (P836): The aim of the project is to implement energy-saving measures (insulation of wall walls, roof structures and replacement of) in the storage halls of the company’s logistics of the company’s logistics. these measures will generate energy savings on the firm’s premises, reduce the economic cost of running the complex and significantly reduce the emissions of pollutants into the atmosphere., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020