Revision history of "Thermal insulation of RTW Trans s.r.o." (Q16380)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

19 June 2023

11 June 2023

17 February 2023

3 July 2022

  • curprev 03:4503:45, 3 July 2022DG Regio talk contribs 43,936 bytes +24,619 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 10:0610:06, 2 December 2021DG Regio talk contribs 15,305 bytes +1,221 Created claim: summary (P836): Das geplante Projekt ist auch der vorgelegte Geschäftsplan, der sich mit der Reduzierung der Gesamtenergieeffizienz eines Verwaltungsgebäudes (Verwaltungs- und Produktionsteil) mit Hilfe des Umbaus des Finanzrahmens befasst. Gegenstand des Projekts ist die komplexe Isolierung der Gebäudehülle, die Isolierung der Decke über dem Produktionsteil des Gebäudes und der Austausch von Lochfüllungen., translated_summary
  • curprev 10:0610:06, 2 December 2021DG Regio talk contribs 14,084 bytes +94 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:3518:35, 28 November 2021DG Regio talk contribs 13,990 bytes +1,271 Created claim: summary (P836): Le projet envisagé est également le plan d’affaires soumis, qui porte sur la réduction de la performance énergétique d’un bâtiment administratif (partie administrative et partie production) avec l’aide de la reconstruction de l’enveloppe. L’objet du projet est l’isolation complexe de l’enveloppe du bâtiment, l’isolation du plafond au-dessus de la partie de production du bâtiment et le remplacement des remplissages de trous., translated_summary
  • curprev 18:3518:35, 28 November 2021DG Regio talk contribs 12,719 bytes +98 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:3316:33, 22 October 2020DG Regio talk contribs 13,070 bytes +1,235 Created claim: summary (P836): The planned project is also the submitted business plan, which addresses the reduction of the energy performance of the administrative building (administrative and production part) with the help of reconstruction of the perimeter shell. The object of the project is complex insulation of the building envelope, insulation of the ceiling above the production part of the building and replacement of hole fillings. a., translated_summary
  • curprev 16:3316:33, 22 October 2020DG Regio talk contribs 11,835 bytes −804 Removed claim: summary (P836): The planned project also provides for a business plan addressing the improvement of the energy performance of the administrative building (administrative and manufacturing part) with the help of the reconstruction of the building envelope. The purpose of the project is the complete insulation of the building envelope, the insulation of the ceiling above the production part of the building and the replacement of the dish filling., remove_old_en...
  • curprev 09:1009:10, 22 October 2020DG Regio talk contribs 12,639 bytes +97 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:1009:10, 22 October 2020DG Regio talk contribs 12,542 bytes −105 Changed label, description and/or aliases in 1 language: remove_english_label

16 July 2020

7 June 2020

25 March 2020

25 February 2020

  • curprev 11:1211:12, 25 February 2020DG Regio talk contribs 11,356 bytes +804 Created claim: summary (P836): The planned project also provides for a business plan addressing the improvement of the energy performance of the administrative building (administrative and manufacturing part) with the help of the reconstruction of the building envelope. The purpose of the project is the complete insulation of the building envelope, the insulation of the ceiling above the production part of the building and the replacement of the dish filling., Adding English...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020