Revision history of "Austerity measures in the building OD ANDY s.r.o." (Q16329)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

11 June 2023

17 February 2023

3 July 2022

  • curprev 03:4303:43, 3 July 2022DG Regio talk contribs 46,434 bytes +27,116 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 10:0410:04, 2 December 2021DG Regio talk contribs 14,809 bytes +1,368 Created claim: summary (P836): Das Wesentliche des Projekts sind energiesparende Maßnahmen in DO ANDY in Česká Lípa. Dies betrifft die Installation eines neuen Beleuchtungssystems als Ersatz für die bestehenden veralteten Anlagen, die Modernisierung von Aufzügen zur Verringerung der Gesamtenergieeffizienz bestehender Antriebe, den Austausch der Motoren von Luftaufbereitungsanlagen, wodurch ihre Energieeffizienz reduziert wird, und die Installation eines Photovoltaik-Kraftwer...
  • curprev 10:0410:04, 2 December 2021DG Regio talk contribs 13,441 bytes +100 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:3818:38, 28 November 2021DG Regio talk contribs 13,341 bytes +1,424 Created claim: summary (P836): L’essentiel du projet est des mesures d’économie d’énergie dans DO ANDY à Česká Lípa. Il s’agit de l’installation d’un nouveau système d’éclairage en remplacement de l’ancien système d’éclairage, de la modernisation des ascenseurs pour réduire la performance énergétique des entraînements existants, du remplacement des moteurs des unités de traitement de l’air, réduisant ainsi leur performance énergétique, et de l’installation d’une centrale pho...
  • curprev 18:3818:38, 28 November 2021DG Regio talk contribs 11,917 bytes +114 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:1416:14, 22 October 2020DG Regio talk contribs 12,252 bytes +1,313 Created claim: summary (P836): The essence of the project is energy saving measures in DO ANDY in Česká Lípa. It is the installation of a new lighting system as a replacement for the existing obsolete, modernisation of lifts in order to reduce the energy performance of existing drives, the replacement of the engines of air handling units, thereby reducing their energy intensity, and installing a photovoltaic power plant on the roof of a building for the production of electri...
  • curprev 16:1416:14, 22 October 2020DG Regio talk contribs 10,939 bytes −824 Removed claim: summary (P836): The project consists of an energy saving measure in the 2011 DO Andy in České Lípa. It is the installation of new lighting systems such as replacement of existing ones, the modernisation of lifts in order to reduce the energy intensity of the existing drives, the replacement of an air-technical unit, thereby decreasing their energy intensity, and the installation of a photovoltaic power plant on the roof of the building for business continuit...
  • curprev 09:0309:03, 22 October 2020DG Regio talk contribs 11,763 bytes +108 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:0309:03, 22 October 2020DG Regio talk contribs 11,655 bytes −102 Changed label, description and/or aliases in 1 language: remove_english_label

24 September 2020

22 September 2020

16 July 2020

7 June 2020

25 March 2020

25 February 2020

  • curprev 11:0911:09, 25 February 2020DG Regio talk contribs 10,469 bytes +824 Created claim: summary (P836): The project consists of an energy saving measure in the 2011 DO Andy in České Lípa. It is the installation of new lighting systems such as replacement of existing ones, the modernisation of lifts in order to reduce the energy intensity of the existing drives, the replacement of an air-technical unit, thereby decreasing their energy intensity, and the installation of a photovoltaic power plant on the roof of the building for business continuity....

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020