Revision history of "Energy saving measures No. 2 in the production area of S E T O R A, s.r.o." (Q16250)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

19 June 2023

11 June 2023

20 February 2023

17 February 2023

3 July 2022

  • curprev 03:3903:39, 3 July 2022DG Regio talk contribs 47,571 bytes +28,000 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 09:5809:58, 2 December 2021DG Regio talk contribs 15,053 bytes +1,385 Created claim: summary (P836): Gegenstand des Projekts ist die Durchführung von Einsparmaßnahmen, die vom Energieprüfer vorgeschlagen werden, um die Energieintensität der Geschäftstätigkeit des Antragstellers zu verringern. Das Projekt sieht die Durchführung folgender Maßnahmen vor: Austausch von Technologien – Brecher, Spanntisch und Säge, darüber hinaus ist der Einbau von 99,66 kWp FV-Panels geplant. Das Projekt wird unter folgender Adresse durchgeführt: Žirovnická 492, 39...
  • curprev 09:5809:58, 2 December 2021DG Regio talk contribs 13,668 bytes +132 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:4418:44, 28 November 2021DG Regio talk contribs 13,536 bytes +1,408 Created claim: summary (P836): Le projet a pour objet la mise en œuvre de mesures d’économies proposées par l’auditeur énergétique afin de réduire l’intensité énergétique de l’activité commerciale du demandeur. Le projet prévoit la mise en œuvre des mesures suivantes: le remplacement des technologies — concasseur, table de serrage et scie, en outre, l’installation de panneaux FV 99,66 kWp est prévue. Le projet sera mis en œuvre à l’adresse suivante: Žirovnická 492, 394 64 Or...
  • curprev 18:4418:44, 28 November 2021DG Regio talk contribs 12,128 bytes +148 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:1316:13, 22 October 2020DG Regio talk contribs 12,429 bytes +1,368 Created claim: summary (P836): The subject of the project is the implementation of austerity measures proposed by the energy auditor in order to reduce the energy performance of the applicant’s business activities. The project provides for the implementation of the following measures: technology exchange – crusher, clamping table and saw, the installation of FV panels with an output of 99.66 kWp is planned. The project will be implemented at: Žirovnická 492, 394 64 Origins o...
  • curprev 16:1316:13, 22 October 2020DG Regio talk contribs 11,061 bytes −832 Removed claim: summary (P836): The aim of the project is to implement the savings measures proposed by the energy auditor in order to reduce the energy intensity of the applicant’s business. The project provides for the following actions: technology exchange — shredder, tensioner and saw, and installation of the FV panels on the performance of 99,66 kWp is planned. The project will be implemented at: Jews No, st. 616/5, st. 616/2, st. 616/1, and 3472/9, cadastral district...
  • curprev 09:0209:02, 22 October 2020DG Regio talk contribs 11,893 bytes +133 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:0209:02, 22 October 2020DG Regio talk contribs 11,760 bytes −148 Changed label, description and/or aliases in 1 language: remove_english_label

22 September 2020

16 July 2020

7 June 2020

25 March 2020

25 February 2020

  • curprev 11:0711:07, 25 February 2020DG Regio talk contribs 10,626 bytes +832 Created claim: summary (P836): The aim of the project is to implement the savings measures proposed by the energy auditor in order to reduce the energy intensity of the applicant’s business. The project provides for the following actions: technology exchange — shredder, tensioner and saw, and installation of the FV panels on the performance of 99,66 kWp is planned. The project will be implemented at: Jews No, st. 616/5, st. 616/2, st. 616/1, and 3472/9, cadastral district Po...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020