Revision history of "Energy savings in the quarry Studenec" (Q16202)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

15 January 2024

11 June 2023

17 February 2023

3 July 2022

  • curprev 03:3703:37, 3 July 2022DG Regio talk contribs 44,125 bytes +25,492 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 09:5509:55, 2 December 2021DG Regio talk contribs 14,482 bytes +1,292 Created claim: summary (P836): Gegenstand des Projekts sind Energieeinsparungen in einem Oberflächenbruch in Studenec, wo der Abbau von Melaphyr stattfindet. Energieeinsparungen werden durch den Austausch des alten Radladers durch eine energiesparendere Option erreicht. Bei der Durchführung des Projekts handelt es sich um das Steinbruchgebiet auf den Parzellen Nr. 1522/12, 1522/11, 1547/2, 1520, 1521, 1522/9, 1547/5, 1547/4, 1522/10, 1522/3, 1523/1, 1613/1 und 1616 in CU. Stu...
  • curprev 09:5509:55, 2 December 2021DG Regio talk contribs 13,190 bytes +101 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:3718:37, 28 November 2021DG Regio talk contribs 13,089 bytes +1,316 Created claim: summary (P836): Le sujet du projet est les économies d’énergie dans une carrière de surface à Studenec, où se déroule l’extraction de mélaphyr. Les économies d’énergie seront réalisées en remplaçant l’ancienne chargeuse sur pneus par une option plus économe en énergie. Le site de mise en œuvre du projet est la zone de carrière sur les parcelles p. 1522/12, 1522/11, 1547/2, 1520, 1521, 1522/9, 1547/5, 1547/4, 1522/10, 1522/3, 1523/1, 1613/1 et 1616 en UC. Studen...
  • curprev 18:3718:37, 28 November 2021DG Regio talk contribs 11,773 bytes +112 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:4016:40, 22 October 2020DG Regio talk contribs 12,110 bytes +1,255 Created claim: summary (P836): The object of the project is energy savings in the surface quarry in Studenec, where the mining of melaphare is taking place. Energy savings will be achieved by replacing the old wheel loader for a more energy-efficient option. The place of implementation of the project is the quarrying area p. no. 1522/12, 1522/11, 1547/2, 1520, 1521, 1522/9, 1547/5, 1547/4, 1522/10, 1522/3, 1523/1, 1613/1 and 1616 in k.ú. Studenec at the Horeks., translated_su...
  • curprev 16:4016:40, 22 October 2020DG Regio talk contribs 10,855 bytes −815 Removed claim: summary (P836): The project involves energy savings on a surface quarry at the Students’ site where melafýr is being harvested. Energy savings will be achieved by replacement of the old wheeled publishing for the more energy-efficient option. The site of project implementation is the quarry area on parcels No 1522/12, 1522/11, 1547/2, 1520, 1521, 1522/9, 1547/5, 1547/4, 1522/10, 1522/3, 1523/1, 1613/1 and 1616 in the cadastral area. Studenec u Harek a., remov...
  • curprev 08:5308:53, 22 October 2020DG Regio talk contribs 11,670 bytes +96 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 08:5308:53, 22 October 2020DG Regio talk contribs 11,574 bytes −100 Changed label, description and/or aliases in 1 language: remove_english_label

16 July 2020

7 June 2020

25 March 2020

25 February 2020

  • curprev 11:1711:17, 25 February 2020DG Regio talk contribs 10,383 bytes +815 Created claim: summary (P836): The project involves energy savings on a surface quarry at the Students’ site where melafýr is being harvested. Energy savings will be achieved by replacement of the old wheeled publishing for the more energy-efficient option. The site of project implementation is the quarry area on parcels No 1522/12, 1522/11, 1547/2, 1520, 1521, 1522/9, 1547/5, 1547/4, 1522/10, 1522/3, 1523/1, 1613/1 and 1616 in the cadastral area. Studenec u Harek a., Adding...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020