Revision history of "Building modifications and insulation of the building ADAST ADAMOV Chateau" (Q16168)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:2706:27, 9 October 2024DG Regio talk contribs 48,199 bytes −1 Changed label, description and/or aliases in pt
  • curprev 06:2706:27, 9 October 2024DG Regio talk contribs 48,200 bytes +7 Set a claim value: summary (P836): A intenção do investidor é fazer modificações de poupança de energia no edifício para cumprir os atuais requisitos e normas técnico-térmicos. O edifício será isolado, incluindo a substituição de obturações insatisfatórias, a instalação de uma nova fonte de calor, incluindo um novo sistema de aquecimento, a troca de instalações elétricas juntamente com a instalação de iluminação de poupança de energia e outras modificações do edifício que conduzam a...

23 March 2024

15 January 2024

11 June 2023

20 February 2023

17 February 2023

3 July 2022

  • curprev 03:3603:36, 3 July 2022DG Regio talk contribs 46,541 bytes +27,142 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 09:5509:55, 2 December 2021DG Regio talk contribs 14,853 bytes +1,374 Created claim: summary (P836): Der Investor beabsichtigt, energiesparende Umbauten des Gebäudes vorzunehmen, um den aktuellen thermischen und technischen Anforderungen und Standards gerecht zu werden. Das Gebäude wird isoliert, einschließlich des Austauschs von nicht konformen Lochfüllungen, der Installation einer neuen Wärmequelle einschließlich eines neuen Heizsystems, der Ersetzung der elektrischen Anlage zusammen mit der Installation energiesparender Beleuchtung und ander...
  • curprev 09:5509:55, 2 December 2021DG Regio talk contribs 13,479 bytes +117 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:3618:36, 28 November 2021DG Regio talk contribs 13,362 bytes +1,418 Created claim: summary (P836): L’investisseur a l’intention d’apporter des modifications économes en énergie au bâtiment afin de répondre aux exigences et normes thermiques et techniques actuelles. Le bâtiment sera isolé, y compris le remplacement des trous de remplissage non conformes, l’installation d’une nouvelle source de chaleur comprenant un nouveau système de chauffage, le remplacement de l’installation électrique ainsi que l’installation d’un éclairage à économie d’én...
  • curprev 18:3618:36, 28 November 2021DG Regio talk contribs 11,944 bytes +133 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:4016:40, 22 October 2020DG Regio talk contribs 12,260 bytes +1,290 Created claim: summary (P836): The investor’s intention is to make energy-saving modifications of the building to meet current thermal-technical requirements and standards. The building will be insulated, including replacement of unsatisfactory hole fillings, installation of new heat source including new heating system, exchange of electrical installation together with installation of energy-saving lighting and other building modifications leading to reduced energy performanc...
  • curprev 16:4016:40, 22 October 2020DG Regio talk contribs 10,970 bytes −801 Removed claim: summary (P836): The investor’s intention is to make energy adjustments to the building compliant with current thermal requirements and standards. Insulation of the object, including the replacement of non-conforming plates, shall be carried out, installation of new heat source including a new heating system, replacement of electrical wiring and other construction modifications leading to a reduction of the energy performance of the object., remove_old_english...
  • curprev 08:5308:53, 22 October 2020DG Regio talk contribs 11,771 bytes +133 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 08:5308:53, 22 October 2020DG Regio talk contribs 11,638 bytes −112 Changed label, description and/or aliases in 1 language: remove_english_label

24 September 2020

22 September 2020

16 July 2020

7 June 2020

25 March 2020

19 March 2020

25 February 2020

  • curprev 11:1611:16, 25 February 2020DG Regio talk contribs 10,476 bytes +801 Created claim: summary (P836): The investor’s intention is to make energy adjustments to the building compliant with current thermal requirements and standards. Insulation of the object, including the replacement of non-conforming plates, shall be carried out, installation of new heat source including a new heating system, replacement of electrical wiring and other construction modifications leading to a reduction of the energy performance of the object., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020