Revision history of "Reduction of energy intensity of selected plants Teplárny Otrokovice a.s." (Q16160)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

19 June 2023

11 June 2023

17 February 2023

3 July 2022

  • curprev 03:3503:35, 3 July 2022DG Regio talk contribs 46,521 bytes +26,320 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 09:5409:54, 2 December 2021DG Regio talk contribs 15,761 bytes +1,291 Created claim: summary (P836): Die Umsetzung des Projekts Reducing the Energy Performance of Selected Operations of TOT a.s., das aus zwei Phasen besteht, der erste sogenannte Rekonstruktion der Umkreishülle des Verwaltungsgebäudes, der zweite „Reconstruction of Outdoor Lighting“ des TOT a.s.-Komplexes führt zu einer Verringerung der Gesamtenergieeffizienz ausgewählter Operationen durch komplexe Lösungen. Das Projekt wird auf dem Grundstück Nr. 334/5, S. 1473 und S. 1742 durc...
  • curprev 09:5409:54, 2 December 2021DG Regio talk contribs 14,470 bytes +154 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:3618:36, 28 November 2021DG Regio talk contribs 14,316 bytes +1,355 Created claim: summary (P836): La mise en œuvre du projet Réduction de la performance énergétique des opérations sélectionnées de TOT a.s., qui se compose de deux étapes, la première appelée Reconstruction de l’enveloppe du périmètre du bâtiment administratif, la seconde appelée Reconstruction de l’éclairage extérieur du complexe TOT a.s. se traduira par une réduction de la performance énergétique des opérations sélectionnées grâce à des solutions complexes. Le projet sera ré...
  • curprev 18:3618:36, 28 November 2021DG Regio talk contribs 12,961 bytes +163 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:4016:40, 22 October 2020DG Regio talk contribs 13,247 bytes +1,265 Created claim: summary (P836): The implementation of the project Reducing energy intensity of selected operations of TOT a.s., which consists of two stages, the first called Reconstruction of the perimeter shell of the administrative building, the second called Reconstruction of outdoor lighting of the TOT a.s. complex will result in a reduction of the energy intensity of selected plants. The project will be realised on land p.č. 334/5, p.č.st. 1473 and p.č.st.1742. a., trans...
  • curprev 16:4016:40, 22 October 2020DG Regio talk contribs 11,982 bytes −833 Removed claim: summary (P836): The implementation of the project to reduce the energy demand of the selected operations of TOT a.s., which consists of two stages, the first name of the Reconstruction of the building envelope, the second with the title of Restructure outdoor lighting of the TOT a.s. site, will take place as a result of a complex solution to reduce the energy intensity of the selected operations. The project will be carried out on parcel No 334/5, n.st.1473 a...
  • curprev 08:5308:53, 22 October 2020DG Regio talk contribs 12,815 bytes +133 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 08:5308:53, 22 October 2020DG Regio talk contribs 12,682 bytes −125 Changed label, description and/or aliases in 1 language: remove_english_label

24 September 2020

22 September 2020

16 July 2020

7 June 2020

25 March 2020

25 February 2020

  • curprev 11:1611:16, 25 February 2020DG Regio talk contribs 11,526 bytes +833 Created claim: summary (P836): The implementation of the project to reduce the energy demand of the selected operations of TOT a.s., which consists of two stages, the first name of the Reconstruction of the building envelope, the second with the title of Restructure outdoor lighting of the TOT a.s. site, will take place as a result of a complex solution to reduce the energy intensity of the selected operations. The project will be carried out on parcel No 334/5, n.st.1473 and...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020