Revision history of "Energy saving measures at Granit Zedníček s.r.o." (Q16044)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:5115:51, 7 October 2024DG Regio talk contribs 51,428 bytes 0 Changed label, description and/or aliases in pt
  • curprev 15:5115:51, 7 October 2024DG Regio talk contribs 51,428 bytes +1 Set a claim value: summary (P836): O objetivo do projeto é a realização de investimentos que consistem no isolamento da fachada do edifício Granit Zedníček s.r.o., onde existem instalações sociais e oficinas e isolamento da fachada do edifício do pavilhão de produção. Além disso, o aquecimento será reconstruído, que será fornecido por 3 bombas de calor ar-água. Posteriormente, a serra de formatação existente será substituída por uma serra de formatação menos intensiva em energia. Est...

7 March 2024

15 January 2024

11 June 2023

17 February 2023

3 July 2022

  • curprev 03:2603:26, 3 July 2022DG Regio talk contribs 47,731 bytes +28,034 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 09:4709:47, 2 December 2021DG Regio talk contribs 15,067 bytes +1,427 Created claim: summary (P836): Gegenstand des Projekts ist die Realisierung von Investitionen, die in der Isolierung der Fassade des Bauunternehmens Granit Zedníček s.r.o. bestehen, wo es soziale Einrichtungen und Werkstätten und Isolierung der Fassade des Gebäudes der Produktionshalle gibt. Darüber hinaus wird die Heizung rekonstruiert, die von 3 Luft-zu-Wasser-Wärmepumpen bereitgestellt wird. Anschließend wird die vorhandene Formatsäge durch eine weniger energieintensive Fo...
  • curprev 09:4709:47, 2 December 2021DG Regio talk contribs 13,640 bytes +109 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:3718:37, 28 November 2021DG Regio talk contribs 13,531 bytes +1,442 Created claim: summary (P836): Le sujet du projet est la réalisation d’investissements consistant en l’isolation de la façade de la société de bâtiment Granit Zedníček s.r.o., où il y a des installations sociales et des ateliers et l’isolation de la façade du bâtiment du hall de production. En outre, le chauffage sera reconstruit, qui sera assuré par 3 pompes à chaleur air-eau. Par la suite, la scie au format existant sera remplacée par une scie à format moins gourmande en én...
  • curprev 18:3718:37, 28 November 2021DG Regio talk contribs 12,089 bytes +121 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:2216:22, 22 October 2020DG Regio talk contribs 12,417 bytes +1,384 Created claim: summary (P836): The object of the project is the realisation of investments consisting of insulation of the facade of the building building Granit Zedníček s.r.o., where there are social facilities and workshops and insulation of the façade of the production hall building. In addition, heating will be reconstructed, which will be provided by 3 air-water heat pumps. Subsequently, the existing formatting saw will be replaced with a less energy-intensive formattin...
  • curprev 16:2216:22, 22 October 2020DG Regio talk contribs 11,033 bytes −936 Removed claim: summary (P836): The project concerns the realisation of investments consisting of the insulation of facades of the facades of Granit’s building site, where social facilities and workshops and the insulation of the façade of the premises of the production hall are located. In addition, heating will be reconstructed which will be provided by 3 air-to-air water pumps. As a result, an existing format saw will be exchanged for a less energy-intensive format. These...
  • curprev 08:4308:43, 22 October 2020DG Regio talk contribs 11,969 bytes +109 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 08:4308:43, 22 October 2020DG Regio talk contribs 11,860 bytes −103 Changed label, description and/or aliases in 1 language: remove_english_label

24 September 2020

22 September 2020

16 July 2020

7 June 2020

25 March 2020

25 February 2020

  • curprev 12:1812:18, 25 February 2020DG Regio talk contribs 10,676 bytes +936 Created claim: summary (P836): The project concerns the realisation of investments consisting of the insulation of facades of the facades of Granit’s building site, where social facilities and workshops and the insulation of the façade of the premises of the production hall are located. In addition, heating will be reconstructed which will be provided by 3 air-to-air water pumps. As a result, an existing format saw will be exchanged for a less energy-intensive format. These e...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020