Revision history of "Energy-saving measures of the Hydroproduct complex" (Q16009)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:2706:27, 9 October 2024DG Regio talk contribs 45,650 bytes 0 Changed label, description and/or aliases in pt
  • curprev 06:2706:27, 9 October 2024DG Regio talk contribs 45,650 bytes +6 Set a claim value: summary (P836): O objetivo do projeto é a implementação de três medidas técnicas de construção para alcançar poupanças no consumo final de energia na área de produção da empresa.Estas atividades são:1) isolamento das paredes do perímetro2) substituição da iluminação existente por lâmpada LED económica3) substituição das caldeiras a gás existentes e das novas caldeiras a gás de condensação. a.

7 March 2024

15 January 2024

19 June 2023

11 June 2023

20 February 2023

17 February 2023

3 July 2022

  • curprev 03:2503:25, 3 July 2022DG Regio talk contribs 42,695 bytes +24,535 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 09:4409:44, 2 December 2021DG Regio talk contribs 16,017 bytes +1,186 Created claim: summary (P836): Gegenstand des Projekts ist die Umsetzung von drei bautechnischen und technischen Maßnahmen zur Einsparung des Endenergieverbrauchs in der Produktionsstätte des Unternehmens.Diese Tätigkeiten sind: 1) Wärmedämmung peripherer Wände2) Ersatz vorhandener Beleuchtung durch einsparendes LED-Licht3) Ersatz vorhandener Gaskessel und neuer Kondensationsgaskessel. a., translated_summary
  • curprev 09:4409:44, 2 December 2021DG Regio talk contribs 14,831 bytes +102 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:3718:37, 28 November 2021DG Regio talk contribs 14,729 bytes +1,280 Created claim: summary (P836): L’objet du projet est la mise en œuvre de trois mesures de construction et techniques pour réaliser des économies de consommation finale d’énergie sur le site de production de l’entreprise. Ces activités sont: 1) l’isolation thermique des parois périphériques 2) le remplacement de l’éclairage existant par des lumières LED économes 3) le remplacement des chaudières à gaz existantes et de nouvelles chaudières à gaz de condensation. a., translated_...
  • curprev 18:3718:37, 28 November 2021DG Regio talk contribs 13,449 bytes +110 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:1916:19, 22 October 2020DG Regio talk contribs 13,796 bytes +1,178 Created claim: summary (P836): The object of the project is the implementation of three construction technical measures to achieve savings of final energy consumption in the company’s production area.These activities are:1) insulation of perimeter walls2) replacement of existing lighting for economical LED lamp3) replacement of existing gas boilers and new condensation gas boilers. a., translated_summary
  • curprev 16:1916:19, 22 October 2020DG Regio talk contribs 12,618 bytes −728 Removed claim: summary (P836): The purpose of the project is the implementation of three technical measures to achieve the final energy savings of the company’s production site. these activities: (1) the insulation of the perimeter wall (2) the replacement of existing lighting at the cost-saving LED lamp (3) is the replacement of existing gas boilers and of a new condensing gas pen., remove_old_english_translation
  • curprev 08:4308:43, 22 October 2020DG Regio talk contribs 13,346 bytes +109 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 08:4308:43, 22 October 2020DG Regio talk contribs 13,237 bytes −109 Changed label, description and/or aliases in 1 language: remove_english_label

15 July 2020

19 June 2020

7 June 2020

25 March 2020

3 March 2020

25 February 2020

  • curprev 12:3612:36, 25 February 2020DG Regio talk contribs 11,242 bytes +728 Created claim: summary (P836): The purpose of the project is the implementation of three technical measures to achieve the final energy savings of the company’s production site. these activities: (1) the insulation of the perimeter wall (2) the replacement of existing lighting at the cost-saving LED lamp (3) is the replacement of existing gas boilers and of a new condensing gas pen., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020