Revision history of "Energy ÚSPORY BUDOVY RUSKÁ 45 In Jičín – Penda s.r.o." (Q15940)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

11 June 2023

17 February 2023

3 July 2022

  • curprev 03:2303:23, 3 July 2022DG Regio talk contribs 44,009 bytes +24,695 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 09:4209:42, 2 December 2021DG Regio talk contribs 15,297 bytes +1,209 Created claim: summary (P836): Gegenstand des Projekts ist die Durchführung von Maßnahmen zur Erzielung von Energieeinsparungen (Isolierung von Peripheriewänden, Dach und Boden, Austausch von Löchern, Installation von kontrollierten Lüftungsanlagen, Modernisierung der Beleuchtung, Warmwasseraufbereitung und Installation von Heizsystemen einschließlich Kondensatorkessel) im Gebäude von Penda s.r.o. in Jině. a., translated_summary
  • curprev 09:4209:42, 2 December 2021DG Regio talk contribs 14,088 bytes +118 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:3518:35, 28 November 2021DG Regio talk contribs 13,970 bytes +1,251 Created claim: summary (P836): Le projet a pour objet la mise en œuvre de mesures visant à réaliser des économies d’énergie (isolation des parois périphériques, toit et plancher, remplacement des trous, installation d’un système de ventilation contrôlée, modernisation de l’éclairage, préparation de l’eau chaude et installation d’un système de chauffage, y compris chaudière à condensation) dans le bâtiment de Penda s.r.o. à Jině a., translated_summary
  • curprev 18:3518:35, 28 November 2021DG Regio talk contribs 12,719 bytes +120 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:1816:18, 22 October 2020DG Regio talk contribs 13,048 bytes +1,180 Created claim: summary (P836): The purpose of the project is to implement measures to achieve energy savings (insulated circuit walls, roofs and floors, replacement of hole fillings, installation of controlled ventilation system, modernisation of lighting, hot water preparation and installation of heating system including condensation boiler) in the building of Penda s.r.o. in Jičně. a., translated_summary
  • curprev 16:1816:18, 22 October 2020DG Regio talk contribs 11,868 bytes −745 Removed claim: summary (P836): The project concerns the implementation of energy saving measures (insulation of the building walls, roofs and floors, replacement of the selector’s filling system, installation of a controlled ventilation system, modernisation of lighting, preparation of hot water and installation of a heating system including condensation boiler) in the building company PENDA s.r.l.., remove_old_english_translation
  • curprev 08:4208:42, 22 October 2020DG Regio talk contribs 12,613 bytes +118 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 08:4208:42, 22 October 2020DG Regio talk contribs 12,495 bytes −128 Changed label, description and/or aliases in 1 language: remove_english_label

24 September 2020

22 September 2020

15 July 2020

7 June 2020

25 March 2020

25 February 2020

  • curprev 12:3512:35, 25 February 2020DG Regio talk contribs 11,337 bytes +745 Created claim: summary (P836): The project concerns the implementation of energy saving measures (insulation of the building walls, roofs and floors, replacement of the selector’s filling system, installation of a controlled ventilation system, modernisation of lighting, preparation of hot water and installation of a heating system including condensation boiler) in the building company PENDA s.r.l.., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020