Revision history of "Energy savings within the framework of the reconstruction of the operating building of CEPS, a.s." (Q15878)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 05:5205:52, 10 October 2024DG Regio talk contribs 51,280 bytes +1 Changed label, description and/or aliases in pt
  • curprev 05:5205:52, 10 October 2024DG Regio talk contribs 51,279 bytes +7 Set a claim value: summary (P836): O projeto centra-se no isolamento do edifício e na reconstrução do sistema de aquecimento e na preparação do TUV no edifício operacional da base técnica do CEPS a.s. em Cítoliby, que é utilizado como edifício operacional há muito tempo. O estado do edifício não cumpre os requisitos existentes para garantir um ambiente de qualidade para os funcionários da empresa, enquanto o consumo de energia é desproporcionalmente alto. A realização do projeto apre...

7 March 2024

15 January 2024

11 June 2023

20 February 2023

17 February 2023

3 July 2022

  • curprev 03:2203:22, 3 July 2022DG Regio talk contribs 48,320 bytes +28,393 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 09:4109:41, 2 December 2021DG Regio talk contribs 16,062 bytes +1,408 Created claim: summary (P836): Das Projekt konzentriert sich auf die Isolierung des Gebäudes und die Rekonstruktion der Heizung und die Vorbereitung des TUV im operativen Gebäude der Firma CEPS a.s. in Cítoliby, die seit langem als Betriebsgebäude genutzt wird. Der Zustand des Gebäudes erfüllt nicht die aktuellen Anforderungen zur Gewährleistung eines Qualitätsumfelds für die Mitarbeiter des Unternehmens, gleichzeitig ist der Energieverbrauch unverhältnismäßig hoch. Mit der D...
  • curprev 09:4109:41, 2 December 2021DG Regio talk contribs 14,654 bytes +139 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:2918:29, 28 November 2021DG Regio talk contribs 14,515 bytes +1,477 Created claim: summary (P836): Le projet est axé sur l’isolation du bâtiment et la reconstruction du système de chauffage et la préparation de TUV dans le bâtiment opérationnel de la base technique de la société CEPS a.s. à Cítoliby, qui a longtemps été utilisé comme un bâtiment opérationnel. L’état du bâtiment ne répond pas aux exigences actuelles pour assurer un environnement de qualité pour les employés de l’entreprise, en même temps la consommation d’énergie est dispropor...
  • curprev 18:2918:29, 28 November 2021DG Regio talk contribs 13,038 bytes +158 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:1816:18, 22 October 2020DG Regio talk contribs 13,333 bytes +1,384 Created claim: summary (P836): The project is focused on insulation of the building and reconstruction of the heating system and preparation of TUV in the operating building of the technical base of CEPS a.s. in Cítoliby, which is used as an operational building for a long time. The state of the building does not meet the existing requirements for ensuring a quality environment for employees of the company, while energy consumption is disproportionately high. Realisation of t...
  • curprev 16:1816:18, 22 October 2020DG Regio talk contribs 11,949 bytes −905 Removed claim: summary (P836): The project focuses on the insulation of the building and the reconstruction of the heating system as well as the preparation of the TUV at CEPS a.s. in CEPS, which is being used in the long term as an operational building. The condition of the object does not correspond to the current requirements of ensuring a good quality environment for employees of the firm, while energy consumption is disproportionately high. The implementation of the pr...
  • curprev 08:2908:29, 22 October 2020DG Regio talk contribs 12,854 bytes +156 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 08:2908:29, 22 October 2020DG Regio talk contribs 12,698 bytes −137 Changed label, description and/or aliases in 1 language: remove_english_label

24 September 2020

15 July 2020

19 June 2020

7 June 2020

25 March 2020

19 March 2020

3 March 2020

25 February 2020

  • curprev 12:0712:07, 25 February 2020DG Regio talk contribs 11,158 bytes +905 Created claim: summary (P836): The project focuses on the insulation of the building and the reconstruction of the heating system as well as the preparation of the TUV at CEPS a.s. in CEPS, which is being used in the long term as an operational building. The condition of the object does not correspond to the current requirements of ensuring a good quality environment for employees of the firm, while energy consumption is disproportionately high. The implementation of the prop...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020