Revision history of "Energy saving by reconstruction of the Holdys complex" (Q15532)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:2706:27, 9 October 2024DG Regio talk contribs 52,009 bytes +1 Changed label, description and/or aliases in pt
  • curprev 06:2706:27, 9 October 2024DG Regio talk contribs 52,008 bytes +11 Set a claim value: summary (P836): O projeto centra-se na revitalização e reconstrução do local de produção existente a partir de 1920 em Děčín, com uma taxa de desemprego de 14 %. Atualmente, uma pequena parte do complexo é usada para aluguel como armazéns ou instalações administrativas de várias empresas. A área torna-se dois edifícios principais ligados por comunicação ao nível de cada andar. Graças à reconstrução de objetos e à instalação de bombas de calor e de energias renováve...

7 March 2024

15 January 2024

11 June 2023

17 February 2023

3 July 2022

  • curprev 03:1203:12, 3 July 2022DG Regio talk contribs 49,325 bytes +28,542 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 09:3509:35, 2 December 2021DG Regio talk contribs 16,987 bytes +1,444 Created claim: summary (P836): Das Projekt konzentriert sich auf die Revitalisierung und den Wiederaufbau der bestehenden Produktionsstätte ab 1920 in Děčín mit einer Arbeitslosenquote von 14 %. Derzeit wird ein kleiner Teil des Komplexes zur Miete als Lager oder Verwaltungseinrichtungen verschiedener Unternehmen verwendet. Der Komplex wird zu zwei Hauptgebäuden, die durch Kommunikation auf der Ebene der einzelnen Etagen miteinander verbunden sind. Dank des Umbaus von Gebäud...
  • curprev 09:3509:35, 2 December 2021DG Regio talk contribs 15,543 bytes +118 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:2718:27, 28 November 2021DG Regio talk contribs 15,425 bytes +1,464 Created claim: summary (P836): Le projet est axé sur la revitalisation et la reconstruction du site de production existant à partir de 1920 à Děčín avec un taux de chômage de 14 %. Actuellement, une petite partie du complexe est utilisée pour la location d’entrepôts ou d’installations administratives de diverses entreprises. Le complexe devient deux bâtiments principaux reliés par la communication au niveau des différents étages. Grâce à la reconstruction des bâtiments et à...
  • curprev 18:2718:27, 28 November 2021DG Regio talk contribs 13,961 bytes +129 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:1416:14, 22 October 2020DG Regio talk contribs 14,285 bytes +1,366 Created claim: summary (P836): The project is focused on the revitalisation and reconstruction of the existing production site from 1920 in Děčín with an unemployment rate of 14 %. At present, a small part of the complex is used for rent as warehouses or administrative facilities of various companies. The area becomes two main buildings connected by communication at the level of each floor. Thanks to the reconstruction of objects and installation of heat pumps and renewables...
  • curprev 16:1416:14, 22 October 2020DG Regio talk contribs 12,919 bytes −908 Removed claim: summary (P836): The project aims at revitalising and reconstructing the existing 1920 site in Děčín with an unemployment rate of 14 %. At present, a small part of the park is being used as a store or the administrative background of different firms. The compound is made from two main buildings, which are interconnected at the level of individual floors. The renovation of premises and the installation of thermal input and renewable energy sources for self-con...
  • curprev 08:0108:01, 22 October 2020DG Regio talk contribs 13,827 bytes +112 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 08:0108:01, 22 October 2020DG Regio talk contribs 13,715 bytes −117 Changed label, description and/or aliases in 1 language: remove_english_label

15 July 2020

19 June 2020

6 June 2020

25 March 2020

3 March 2020

25 February 2020

  • curprev 11:4111:41, 25 February 2020DG Regio talk contribs 12,130 bytes +908 Created claim: summary (P836): The project aims at revitalising and reconstructing the existing 1920 site in Děčín with an unemployment rate of 14 %. At present, a small part of the park is being used as a store or the administrative background of different firms. The compound is made from two main buildings, which are interconnected at the level of individual floors. The renovation of premises and the installation of thermal input and renewable energy sources for self-consu...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020