Revision history of "Reduction of energy intensity of drying by using waste heat – Borovany" (Q15512)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 05:5205:52, 10 October 2024DG Regio talk contribs 48,858 bytes +22 Changed label, description and/or aliases in pt
  • curprev 05:5205:52, 10 October 2024DG Regio talk contribs 48,836 bytes −4 Set a claim value: summary (P836): O objetivo do projeto é reduzir a intensidade energética da produção de telhas e ladrilhos cerâmicos. A medida proposta na EA processada será implementada. Será efetuada uma atualização do atual sistema de combustão do secador por pulverização para a produção de granulado, o que permitirá a utilização de energia térmica dos fornos a gás de combustão para substituir a parte do ar de secagem. Ao mesmo tempo, o filtro de flúor será instalado para limpa...

22 March 2024

15 January 2024

11 June 2023

20 February 2023

17 February 2023

3 July 2022

  • curprev 03:1103:11, 3 July 2022DG Regio talk contribs 47,692 bytes +27,491 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 09:3509:35, 2 December 2021DG Regio talk contribs 15,778 bytes +1,292 Created claim: summary (P836): Ziel des Projekts ist es, die Energieintensität der Keramikfliesen und Fliesenproduktion zu reduzieren. Die von der EA vorgeschlagene Maßnahme wird umgesetzt. Es wird eine Modernisierung des bestehenden Verbrennungssystems des Atomofens zur Herstellung von Granulat durchgeführt, das die Nutzung der Wärmeenergie der Rauchgasöfen als Ersatz für den Teil der Trocknungsluft ermöglicht. Gleichzeitig wird ein Fluorfilter installiert, um die Rauchgasöf...
  • curprev 09:3509:35, 2 December 2021DG Regio talk contribs 14,486 bytes +151 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:2618:26, 28 November 2021DG Regio talk contribs 14,335 bytes +1,355 Created claim: summary (P836): L’objectif du projet est de réduire l’intensité énergétique de la production de carreaux et de tuiles en céramique. La mesure proposée par l’EE sera mise en œuvre. Une mise à niveau du système de combustion existant du four atomique pour la production de granulés sera réalisée, ce qui permettra l’utilisation de l’énergie thermique des fours à gaz de combustion en remplacement de la partie de l’air de séchage. En même temps, un filtre à fluor ser...
  • curprev 18:2618:26, 28 November 2021DG Regio talk contribs 12,980 bytes +157 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:0216:02, 22 October 2020DG Regio talk contribs 13,272 bytes +1,292 Created claim: summary (P836): The aim of the project is to reduce the energy intensity of the production of ceramic tiles and tiles. The measure proposed in the processed EA will be implemented. An upgrade will be made to the existing combustion system of the spray dryer for the production of granulate, which will allow the use of thermal energy of the flue gas furnaces to replace the part of the drying air. At the same time, the fluorine filter will be installed to clean th...
  • curprev 16:0216:02, 22 October 2020DG Regio talk contribs 11,980 bytes −777 Removed claim: summary (P836): The project aims at reducing the energy performance of ceramic tiles and tiles. The measures proposed in the processed EA will be implemented. The existing combustion system for drying grains to produce chips will be used to make it possible to use the oven heat energy to replace part of the drying air. The installation of the fluorine filter shall also be installed at the end of the flue gas purge. a., remove_old_english_translation
  • curprev 08:1008:10, 22 October 2020DG Regio talk contribs 12,757 bytes +131 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 08:1008:10, 22 October 2020DG Regio talk contribs 12,626 bytes −133 Changed label, description and/or aliases in 1 language: remove_english_label

15 July 2020

6 June 2020

25 March 2020

25 February 2020

  • curprev 11:4011:40, 25 February 2020DG Regio talk contribs 11,468 bytes +777 Created claim: summary (P836): The project aims at reducing the energy performance of ceramic tiles and tiles. The measures proposed in the processed EA will be implemented. The existing combustion system for drying grains to produce chips will be used to make it possible to use the oven heat energy to replace part of the drying air. The installation of the fluorine filter shall also be installed at the end of the flue gas purge. a., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020