Revision history of "Energy savings Prefa Brno a.s., plant BRNO" (Q15456)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

11 June 2023

17 February 2023

3 July 2022

  • curprev 03:0803:08, 3 July 2022DG Regio talk contribs 41,850 bytes +23,188 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 08:2708:27, 2 December 2021DG Regio talk contribs 14,924 bytes +1,123 Created claim: summary (P836): Das Projekt wird thermische technische Maßnahmen umsetzen und damit die Energieintensität des Verwaltungsgebäudes des Unternehmens deutlich reduzieren. Insbesondere werden die Isolierung der Gebäudehülle und die Rekonstruktion der Verkabelung in Übereinstimmung mit dem Energieaudit durchgeführt., translated_summary
  • curprev 08:2708:27, 2 December 2021DG Regio talk contribs 13,801 bytes +105 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:2618:26, 28 November 2021DG Regio talk contribs 13,696 bytes +1,150 Created claim: summary (P836): Le projet mettra en œuvre des mesures techniques thermiques et réduira ainsi considérablement l’intensité énergétique du bâtiment administratif de l’entreprise. En particulier, l’isolation de la coque du bâtiment et la reconstruction du câblage seront mises en œuvre, tous conformément à l’audit énergétique., translated_summary
  • curprev 18:2618:26, 28 November 2021DG Regio talk contribs 12,546 bytes +113 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:0116:01, 22 October 2020DG Regio talk contribs 12,882 bytes +1,128 Created claim: summary (P836): The project will implement thermally technical measures and thus significantly reduce the energy performance of the company’s administrative structure. There will be implementation especially insulation of the building casing and reconstruction of distributions, all in accordance with the energy audit. a., translated_summary
  • curprev 16:0116:01, 22 October 2020DG Regio talk contribs 11,754 bytes −692 Removed claim: summary (P836): The project will lead to the implementation of thermal technological measures and thus a significant reduction in the energy intensity of the company’s administrative object. In particular, the insulation of the building envelope and the reconstruction of the divorces are carried out in accordance with energy output., remove_old_english_translation
  • curprev 08:0908:09, 22 October 2020DG Regio talk contribs 12,446 bytes +101 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 08:0908:09, 22 October 2020DG Regio talk contribs 12,345 bytes −95 Changed label, description and/or aliases in 1 language: remove_english_label

24 September 2020

22 September 2020

15 July 2020

6 June 2020

25 March 2020

19 March 2020

25 February 2020

  • curprev 11:3911:39, 25 February 2020DG Regio talk contribs 11,182 bytes +692 Created claim: summary (P836): The project will lead to the implementation of thermal technological measures and thus a significant reduction in the energy intensity of the company’s administrative object. In particular, the insulation of the building envelope and the reconstruction of the divorces are carried out in accordance with energy output., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020