Revision history of "Insulated storage space Kochmantrans" (Q15448)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:5115:51, 7 October 2024DG Regio talk contribs 50,074 bytes −11 Set a claim value: summary (P836): A recorrente dispõe de um armazém de peças sobressalentes nas instalações, que funciona parcialmente como oficina de desmontagem. Estes espaços serão isolados como parte da implementação do projeto, incluindo a substituição dos enchimentos de abertura, e uma nova fonte de aquecimento e nova iluminação será instalada (até agora o armazém foi aquecido, se necessário, por aquecedores de aquecimento) de acordo com a avaliação energética. A implementação...

7 March 2024

15 January 2024

19 June 2023

11 June 2023

17 February 2023

3 July 2022

  • curprev 03:0803:08, 3 July 2022DG Regio talk contribs 47,413 bytes +27,098 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 08:2708:27, 2 December 2021DG Regio talk contribs 15,825 bytes +1,351 Created claim: summary (P836): Die Klägerin verfügt über ein Ersatzteillager auf dem Gelände, das zum Teil als Abbau der Werkstatt dient. Diese Räumlichkeiten werden im Rahmen der Durchführung des Projekts, einschließlich des Austauschs der Öffnungsfüllungen, isoliert, und eine neue Quelle für Heizung und neue Beleuchtung wird gemäß der Energiebewertung installiert (das Lager wurde erforderlichenfalls durch direkte Heizung beheizt). Die Umsetzung des Projekts wird die Umwelt...
  • curprev 08:2708:27, 2 December 2021DG Regio talk contribs 14,474 bytes +97 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:2618:26, 28 November 2021DG Regio talk contribs 14,377 bytes +1,420 Created claim: summary (P836): La requérante dispose d’un entrepôt de pièces détachées dans les locaux, qui sert en partie de démontage de l’atelier. Ces locaux seront isolés dans le cadre de la mise en œuvre du projet, y compris le remplacement des garnitures d’ouverture, et une nouvelle source de chauffage et un nouvel éclairage seront installés (l’entrepôt a été chauffé si nécessaire par chauffage direct) conformément à l’évaluation énergétique. La mise en œuvre du projet...
  • curprev 18:2618:26, 28 November 2021DG Regio talk contribs 12,957 bytes +105 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:0116:01, 22 October 2020DG Regio talk contribs 13,301 bytes +1,350 Created claim: summary (P836): The applicant has a spare parts warehouse on the premises, which partially serves as a dismantling workshop. These spaces will be insulated as part of the project implementation, including replacement of opening fillings, and a new source of heating and new lighting will be installed (so far the warehouse has been heated if necessary by heating heaters) in accordance with the energy assessment. Implementation of the project will optimise the env...
  • curprev 16:0116:01, 22 October 2020DG Regio talk contribs 11,951 bytes −856 Removed claim: summary (P836): The applicant has in place in the area of his/her premises a warehouse of spare parts which partially serves as a distraint. These premises will be filled during the implementation of the project, including the filling of the hole, and a new source of heating and new lighting will be installed (the warehouse needed to date) in accordance with the energy assessment. Implementation of the project will optimise the storage environment and optimis...
  • curprev 08:0708:07, 22 October 2020DG Regio talk contribs 12,807 bytes +95 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 08:0708:07, 22 October 2020DG Regio talk contribs 12,712 bytes −125 Changed label, description and/or aliases in 1 language: remove_english_label

24 September 2020

22 September 2020

15 July 2020

6 June 2020

25 March 2020

25 February 2020

  • curprev 11:3911:39, 25 February 2020DG Regio talk contribs 11,549 bytes +856 Created claim: summary (P836): The applicant has in place in the area of his/her premises a warehouse of spare parts which partially serves as a distraint. These premises will be filled during the implementation of the project, including the filling of the hole, and a new source of heating and new lighting will be installed (the warehouse needed to date) in accordance with the energy assessment. Implementation of the project will optimise the storage environment and optimise...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020