Revision history of "Thermal insulation of the building SPRINT TRADING s.r.o., Reymontova ul. The Countess" (Q15442)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

15 January 2024

11 June 2023

17 February 2023

3 July 2022

  • curprev 03:0803:08, 3 July 2022DG Regio talk contribs 48,425 bytes +28,045 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 08:2708:27, 2 December 2021DG Regio talk contribs 15,798 bytes +1,152 Created claim: summary (P836): Das Projekt befasst sich mit Maßnahmen zur Verbesserung der Energieeffizienz des Gebäudes des Hauptsitzes von SPRINT TRADING s.r.o., um die Erfüllung der Richtlinie 2012/27/EU des Europäischen Parlaments und des Rates über Energieeffizienz zu unterstützen und das für die Tschechische Republik gesetzte Ziel zu unterstützen., translated_summary
  • curprev 08:2608:26, 2 December 2021DG Regio talk contribs 14,646 bytes +133 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:2618:26, 28 November 2021DG Regio talk contribs 14,513 bytes +1,428 Created claim: summary (P836): Le projet portera sur des mesures visant à améliorer la performance énergétique du bâtiment du siège de SPRINT TRADING s.r.o. afin de soutenir la mise en œuvre de la directive 2012/27/UE du Parlement européen et du Conseil relative à l’efficacité énergétique et de soutenir l’objectif fixé pour la République tchèque. Cette mesure comprendra l’isolation de la façade du bâtiment, le remplacement d’une partie du remplissage des trous, où les ouvertu...
  • curprev 18:2618:26, 28 November 2021DG Regio talk contribs 13,085 bytes +128 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:0116:01, 22 October 2020DG Regio talk contribs 13,406 bytes +1,387 Created claim: summary (P836): The project will address measures to reduce the energy performance of the SPRINT TRADING s.r.o. headquarters building to support the fulfilment of Directive 2012/27/EU of the European Parliament and of the Council on energy efficiency and support of the objective set for the Czech Republic.Within the framework of the measure, the building facade will be insulated, the part of the filling of openings will be replaced, where the filling of the ope...
  • curprev 16:0116:01, 22 October 2020DG Regio talk contribs 12,019 bytes −880 Removed claim: summary (P836): The project will address measures to reduce the energy performance of the seat of the company Sprint TRADING s.r.o. in support of the implementation of Directive 2012/27/EU of the European Parliament and of the Council on energy efficiency and the objective laid down for the ČR.V, a insulation of the façade of the building will be carried out, the part of the filling is replaced by the hole, when large parts of the building are already filled...
  • curprev 08:0708:07, 22 October 2020DG Regio talk contribs 12,899 bytes +144 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 08:0708:07, 22 October 2020DG Regio talk contribs 12,755 bytes −130 Changed label, description and/or aliases in 1 language: remove_english_label

15 July 2020

6 June 2020

25 March 2020

25 February 2020

  • curprev 11:3911:39, 25 February 2020DG Regio talk contribs 11,594 bytes +880 Created claim: summary (P836): The project will address measures to reduce the energy performance of the seat of the company Sprint TRADING s.r.o. in support of the implementation of Directive 2012/27/EU of the European Parliament and of the Council on energy efficiency and the objective laid down for the ČR.V, a insulation of the façade of the building will be carried out, the part of the filling is replaced by the hole, when large parts of the building are already filled in...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020