Revision history of "Energy savings of Draps s.r.o." (Q15422)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:5115:51, 7 October 2024DG Regio talk contribs 44,617 bytes +1 Changed label, description and/or aliases in pt
  • curprev 15:5115:51, 7 October 2024DG Regio talk contribs 44,616 bytes 0 Set a claim value: summary (P836): O objetivo do projeto apresentado é reduzir o desempenho energético do edifício Draps s.r.o. O projeto incluirá isolamento do invólucro exterior, isolamento do piso térreo, substituição de luxfer, iluminação com fontes de luz LED e instalação do sistema automático de controlo de temperatura IRC. a.

22 March 2024

15 January 2024

11 June 2023

17 February 2023

3 July 2022

  • curprev 03:0703:07, 3 July 2022DG Regio talk contribs 41,944 bytes +23,026 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 09:3709:37, 2 December 2021DG Regio talk contribs 15,050 bytes +1,155 Created claim: summary (P836): Ziel des vorgestellten Projekts ist es, die Energieeffizienz des Gebäudes von DRAPS s.r.o. zu reduzieren. Das Projekt wird die Isolierung der Hülle, die Isolierung des Bodenbodens, den Austausch von Luxfer, die Modernisierung der Beleuchtung mit LED-Lichtquellen und die Installation des automatischen Temperaturreglersystems IRC. a., translated_summary
  • curprev 09:3709:37, 2 December 2021DG Regio talk contribs 13,895 bytes +113 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:2118:21, 28 November 2021DG Regio talk contribs 13,782 bytes +1,186 Created claim: summary (P836): L’objectif du projet présenté est de réduire la performance énergétique du bâtiment de DRAPS s.r.o. Le projet fournira l’isolation de l’enveloppe, l’isolation du sol du sol, le remplacement du luxfer, la modernisation de l’éclairage avec des sources lumineuses LED et l’installation d’un système automatique de contrôle de température IRC. a., translated_summary
  • curprev 18:2118:21, 28 November 2021DG Regio talk contribs 12,596 bytes +129 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:3716:37, 22 October 2020DG Regio talk contribs 12,916 bytes +1,130 Created claim: summary (P836): The aim of the submitted project is to reduce the energy performance of the Draps s.r.o. building.The project will include insulation of the outer shell, insulation of the ground floor, luxfer replacement, illumination with LED light sources and installation of the automatic temperature control system IRC. a., translated_summary
  • curprev 16:3716:37, 22 October 2020DG Regio talk contribs 11,786 bytes −617 Removed claim: summary (P836): The present project aims at reducing the energy performance of DRAPS s.r.o. Building with insulation of the building envelope, insulation of the ground floor, replacement of luxer, retrofit of LED light sources and installation of an IRC system., remove_old_english_translation
  • curprev 07:5707:57, 22 October 2020DG Regio talk contribs 12,403 bytes +89 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 07:5707:57, 22 October 2020DG Regio talk contribs 12,314 bytes −105 Changed label, description and/or aliases in 1 language: remove_english_label

24 September 2020

15 July 2020

6 June 2020

25 March 2020

25 February 2020

  • curprev 11:2411:24, 25 February 2020DG Regio talk contribs 11,137 bytes +617 Created claim: summary (P836): The present project aims at reducing the energy performance of DRAPS s.r.o. Building with insulation of the building envelope, insulation of the ground floor, replacement of luxer, retrofit of LED light sources and installation of an IRC system., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020