Revision history of "Reduction of energy performance of the production area of BOPAL – window and door accessories, s.r.o." (Q15416)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

19 June 2023

11 June 2023

20 February 2023

17 February 2023

3 July 2022

  • curprev 03:0703:07, 3 July 2022DG Regio talk contribs 48,339 bytes +27,938 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 09:3709:37, 2 December 2021DG Regio talk contribs 15,945 bytes +1,277 Created claim: summary (P836): Das Projekt wird die thermischen und technischen Eigenschaften des Gebäudes auf dem Firmengelände verbessern – die Gebäudehülle, ein Teil des Daches wird isoliert und einige Öffnungsfüllungen werden ersetzt. Das Projekt wird auch die Wärmequelle ersetzen – eine Wärmepumpe wird installiert, um das Gebäude zu beheizen und die Heizung wird umgebaut. Das Gebäude wird auch im Rahmen des Projekts modernisiert. In der letzten Zeile wird FVE. und., tran...
  • curprev 09:3709:37, 2 December 2021DG Regio talk contribs 14,668 bytes +161 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:2118:21, 28 November 2021DG Regio talk contribs 14,507 bytes +1,333 Created claim: summary (P836): Le projet améliorera les propriétés thermiques et techniques du bâtiment dans les locaux de l’entreprise — l’enveloppe du bâtiment, une partie du toit sera isolée et quelques garnitures d’ouverture seront remplacées. Le projet remplacera également la source de chaleur — une pompe à chaleur sera installée pour chauffer le bâtiment et le système de chauffage sera reconstruit. Le bâtiment sera également modernisé dans le cadre du projet. Dans la de...
  • curprev 18:2118:21, 28 November 2021DG Regio talk contribs 13,174 bytes +181 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:3716:37, 22 October 2020DG Regio talk contribs 13,442 bytes +1,343 Created claim: summary (P836): The project will improve the thermally technical characteristics of the building on the premises of the company – the envelope of the building, part of the roof will be insulated and some opening fillings will be replaced. The project will also include an exchange of heat source – a heat pump will be installed to heat the building and the heating system will be rebuilt in connection with this. The building will also undergo modernisation of ligh...
  • curprev 16:3716:37, 22 October 2020DG Regio talk contribs 12,099 bytes −866 Removed claim: summary (P836): The project will improve the thermal characteristics of the building at the company’s premises — a building envelope, part of the roof, and some tutorials to be replaced. In addition, the project involves the exchange of a heat generator with the installation of a heat pump on which the heat is heated and, in this connection, the heating system will be retrofitted. The building will also undergo the modernisation of lighting in the building. T...
  • curprev 07:5707:57, 22 October 2020DG Regio talk contribs 12,965 bytes +163 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 07:5707:57, 22 October 2020DG Regio talk contribs 12,802 bytes −141 Changed label, description and/or aliases in 1 language: remove_english_label

24 September 2020

22 September 2020

15 July 2020

6 June 2020

25 March 2020

19 March 2020

25 February 2020

  • curprev 11:2311:23, 25 February 2020DG Regio talk contribs 11,676 bytes +866 Created claim: summary (P836): The project will improve the thermal characteristics of the building at the company’s premises — a building envelope, part of the roof, and some tutorials to be replaced. In addition, the project involves the exchange of a heat generator with the installation of a heat pump on which the heat is heated and, in this connection, the heating system will be retrofitted. The building will also undergo the modernisation of lighting in the building. The...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020