Revision history of "Energy savings in MICRO-EPSILON Czech Republic" (Q15405)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 05:5205:52, 10 October 2024DG Regio talk contribs 49,162 bytes +2 Changed label, description and/or aliases in pt
  • curprev 05:5205:52, 10 October 2024DG Regio talk contribs 49,160 bytes +34 Set a claim value: summary (P836): A fim de aumentar a eficiência da utilização da energia e do calor, serão aplicadas as seguintes medidas: — modernização e reconstrução das distribuições de eletricidade e calor nos edifícios da empresa e não só — nova Trafostation, — redução do desempenho energético dos edifícios, — instalação de ventilação com recuperação de calor residual para aquecimento de água, — substituição de antigas estruturas de iluminação por estruturas mais económicas,...

23 March 2024

15 January 2024

19 June 2023

11 June 2023

17 February 2023

3 July 2022

  • curprev 03:0703:07, 3 July 2022DG Regio talk contribs 46,454 bytes +26,478 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 09:3809:38, 2 December 2021DG Regio talk contribs 15,677 bytes +1,297 Created claim: summary (P836): Um die Effizienz der Energie- und Wärmenutzung zu steigern, werden folgende Maßnahmen umgesetzt: — Modernisierung und Rekonstruktion der Strom- und Wärmeverteilung in den Gebäuden des Unternehmens und darüber hinaus – neue Trafostation,- Verbesserung der Gesamtenergieeffizienz von Gebäuden,- Installation von Klimaanlagen mit Abwärmerückgewinnung für die Warmwasserbereitung,- Ersatz alter Beleuchtungselemente für wirtschaftlichere,- Sanierung de...
  • curprev 09:3709:37, 2 December 2021DG Regio talk contribs 14,380 bytes +118 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:2118:21, 28 November 2021DG Regio talk contribs 14,262 bytes +1,389 Created claim: summary (P836): Afin d’accroître l’efficacité de la consommation d’énergie et de chaleur, les mesures suivantes seront mises en œuvre: — modernisation et reconstruction de la distribution d’électricité et de chaleur dans les bâtiments de l’entreprise et au-delà — nouvelle Trafostation,- amélioration de la performance énergétique des bâtiments,- installation de climatisation avec récupération de chaleur résiduelle pour le chauffage de l’eau,- remplacement des a...
  • curprev 18:2118:21, 28 November 2021DG Regio talk contribs 12,873 bytes +122 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:3616:36, 22 October 2020DG Regio talk contribs 13,200 bytes +1,283 Created claim: summary (P836): For the purpose of increasing efficiency of energy and heat use, the following measures will be implemented: — modernisation and reconstruction of distributions of electricity and heat in the company’s buildings and beyond – new Trafostation,- reduction of energy performance of buildings,- installation of ventilation with waste heat recovery for water heating,- replacement of old lighting bodies for more economical,- reconstruction of boiler ro...
  • curprev 16:3616:36, 22 October 2020DG Regio talk contribs 11,917 bytes −854 Removed claim: summary (P836): For the purpose of increasing the efficiency of energy and heat recovery, the following measures shall be implemented: — modernisation and reconstruction of electricity and heat distribution in both company and non-farm buildings — new transformer stations, — energy performance of buildings, — installation of energy storage plants with recuperation of waste heat for water heating, — replacement of old lighting bodies in more economy — refurbi...
  • curprev 07:5707:57, 22 October 2020DG Regio talk contribs 12,771 bytes +105 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 07:5707:57, 22 October 2020DG Regio talk contribs 12,666 bytes −105 Changed label, description and/or aliases in 1 language: remove_english_label

22 September 2020

15 July 2020

6 June 2020

25 March 2020

25 February 2020

  • curprev 11:2311:23, 25 February 2020DG Regio talk contribs 11,490 bytes +854 Created claim: summary (P836): For the purpose of increasing the efficiency of energy and heat recovery, the following measures shall be implemented: — modernisation and reconstruction of electricity and heat distribution in both company and non-farm buildings — new transformer stations, — energy performance of buildings, — installation of energy storage plants with recuperation of waste heat for water heating, — replacement of old lighting bodies in more economy — refurbish...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020