Revision history of "Energy savings – production company Sedlecký kaolin" (Q15404)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:2104:21, 11 October 2024DG Regio talk contribs 45,174 bytes +1 Changed label, description and/or aliases in pt
  • curprev 04:2104:21, 11 October 2024DG Regio talk contribs 45,173 bytes −6 Set a claim value: summary (P836): O projeto tem por objeto alterações na construção de edifícios de produção e edifícios administrativos nas instalações da fábrica de caulino de Sedlecký, em Božičany, perto de Karlovy Vary, que conduzam à melhoria das propriedades térmicas técnicas das instalações e à otimização dos custos energéticos da unidade de produção.

23 March 2024

15 January 2024

19 June 2023

11 June 2023

17 February 2023

3 July 2022

  • curprev 03:0703:07, 3 July 2022DG Regio talk contribs 42,507 bytes +23,658 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 09:3709:37, 2 December 2021DG Regio talk contribs 15,044 bytes +1,136 Created claim: summary (P836): Gegenstand des Projekts ist der Bau von Produktionsanlagen und Verwaltungsgebäuden in den Räumlichkeiten des Werks Sedlecký kaolin in Božičany bei Karlovy Vary, was zur Verbesserung der thermischen technischen Eigenschaften der Räumlichkeiten und zur Optimierung der Energiekosten der Produktionsanlage führt., translated_summary
  • curprev 09:3709:37, 2 December 2021DG Regio talk contribs 13,908 bytes +122 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:2118:21, 28 November 2021DG Regio talk contribs 13,786 bytes +1,161 Created claim: summary (P836): Le projet a pour objet la construction d’installations de production et de bâtiments administratifs dans les locaux de l’usine de Sedlecký kaolin à Božičany, près de Karlovy Vary, ce qui a permis d’améliorer les propriétés techniques thermiques des locaux et d’optimiser les coûts énergétiques de l’usine de production., translated_summary
  • curprev 18:2118:21, 28 November 2021DG Regio talk contribs 12,625 bytes +127 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:3616:36, 22 October 2020DG Regio talk contribs 12,947 bytes +1,149 Created claim: summary (P836): The object of the project is construction modifications of production buildings and administrative buildings in the premises of the Sedlecký kaolin plant in Božičany near Karlovy Vary, leading to the improvement of the thermally technical properties of the premises and to optimise the energy costs of the production plant. a., translated_summary
  • curprev 16:3616:36, 22 October 2020DG Regio talk contribs 11,798 bytes −668 Removed claim: summary (P836): The project concerns the construction of production facilities and administrative buildings at the plant site of Sedlecki kaolina in Karlovy Vary, leading to the improvement of the thermal characteristics of premises at premises and the optimisation of the cost of energy of the production plant., remove_old_english_translation
  • curprev 07:5707:57, 22 October 2020DG Regio talk contribs 12,466 bytes +113 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 07:5707:57, 22 October 2020DG Regio talk contribs 12,353 bytes −109 Changed label, description and/or aliases in 1 language: remove_english_label

15 July 2020

6 June 2020

25 March 2020

25 February 2020

  • curprev 11:2311:23, 25 February 2020DG Regio talk contribs 11,171 bytes +668 Created claim: summary (P836): The project concerns the construction of production facilities and administrative buildings at the plant site of Sedlecki kaolina in Karlovy Vary, leading to the improvement of the thermal characteristics of premises at premises and the optimisation of the cost of energy of the production plant., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020