Revision history of "Energy savings in Nestlé – establishment Holešov" (Q15367)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:5118:51, 8 October 2024DG Regio talk contribs 49,268 bytes +2 Changed label, description and/or aliases in pt
  • curprev 18:5118:51, 8 October 2024DG Regio talk contribs 49,266 bytes +9 Set a claim value: summary (P836): No âmbito do projeto, serão realizados investimentos em medidas de poupança de energia na fábrica de chocolate de Holešov. Com base nas análises técnicas e económicas processadas e nas recomendações da auditoria energética, proceder-se-á à reconstrução do edifício administrativo e do edifício social com cantina e à substituição do arrefecimento do compressor, incluindo a otimização do sistema de controlo do condensador de arrefecimento, a fim de red...

7 March 2024

15 January 2024

11 June 2023

17 February 2023

3 July 2022

  • curprev 03:0603:06, 3 July 2022DG Regio talk contribs 46,585 bytes +26,646 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 09:3609:36, 2 December 2021DG Regio talk contribs 15,663 bytes +1,294 Created claim: summary (P836): Das Projekt wird Investitionen in energiesparende Maßnahmen in der Schokoladenfabrik in Holešov durchführen. Auf der Grundlage der technischen und wirtschaftlichen Analysen und Empfehlungen des Energieaudits werden die Rekonstruktion des Verwaltungsgebäudes und des Sozialgebäudes mit dem Speisesaal und der Austausch des Kühlkompressors, einschließlich der Optimierung der Kühlkondensatorsteuerung, durchgeführt, um die Energieeffizienz des Betrieb...
  • curprev 09:3609:36, 2 December 2021DG Regio talk contribs 14,369 bytes +102 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:2018:20, 28 November 2021DG Regio talk contribs 14,267 bytes +1,357 Created claim: summary (P836): Le projet mettra en œuvre des investissements dans des mesures d’économie d’énergie à l’usine de chocolat de Holešov. Sur la base des analyses techniques et économiques et des recommandations de l’audit énergétique, la reconstruction du bâtiment administratif et social avec la salle à manger et le remplacement du compresseur de refroidissement, y compris l’optimisation du système de contrôle du condenseur de refroidissement, seront effectuées af...
  • curprev 18:2018:20, 28 November 2021DG Regio talk contribs 12,910 bytes +106 Changed label, description and/or aliases in fr: translated_label

28 October 2020

22 October 2020

  • curprev 16:3616:36, 22 October 2020DG Regio talk contribs 13,249 bytes +1,292 Created claim: summary (P836): As part of the project, investments in energy-saving measures in the chocolate factory in Holešov will be implemented. On the basis of processed technical and economic analyses and recommendations of the energy audit, reconstruction of the administrative building and social building with canteen and replacement of compressor cooling including optimisation of the cooling condenser control system in order to reduce the energy intensity of operatio...
  • curprev 16:3616:36, 22 October 2020DG Regio talk contribs 11,957 bytes −829 Removed claim: summary (P836): The project will make investments in energy-saving measures in the chocolate plant in Holešove. On the basis of the technical and economic analyses carried out and the recommendation of the energy audit, the renovation of the administrative building and the social building with the canteen and the exchange of the cooling compressor will be carried out, including the optimisation of the cooling system for cooling in order to reduce the energy i...
  • curprev 07:5707:57, 22 October 2020DG Regio talk contribs 12,786 bytes +111 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 07:5707:57, 22 October 2020DG Regio talk contribs 12,675 bytes −106 Changed label, description and/or aliases in 1 language: remove_english_label

22 September 2020

15 July 2020

6 June 2020

25 March 2020

25 February 2020

  • curprev 11:2211:22, 25 February 2020DG Regio talk contribs 11,499 bytes +829 Created claim: summary (P836): The project will make investments in energy-saving measures in the chocolate plant in Holešove. On the basis of the technical and economic analyses carried out and the recommendation of the energy audit, the renovation of the administrative building and the social building with the canteen and the exchange of the cooling compressor will be carried out, including the optimisation of the cooling system for cooling in order to reduce the energy int...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020