Revision history of "Wood – installation of biomass boiler, DPST, heat distribution" (Q15349)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 16:4116:41, 10 October 2024DG Regio talk contribs 46,873 bytes 0 Changed label, description and/or aliases in pt
  • curprev 16:4116:41, 10 October 2024DG Regio talk contribs 46,873 bytes 0 Set a claim value: summary (P836): Instalação de caldeira para combustão de biomassa com uma potência de 2,5 MWt. A caldeira queimará matéria lenhosa. Parte do projeto é a remoção da caldeira desatualizada existente para a combustão de biomassa, a instalação de novas estações de entrega em centenas de clientes, a construção de novas distribuições de calor para ligar novos clientes e a instalação de estações de transferência.

7 March 2024

15 January 2024

19 June 2023

11 June 2023

17 February 2023

3 July 2022

  • curprev 03:0503:05, 3 July 2022DG Regio talk contribs 43,177 bytes +24,825 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 09:3509:35, 2 December 2021DG Regio talk contribs 14,308 bytes +1,178 Created claim: summary (P836): Installation eines Biomassekessels mit einer Leistung von 2,5 MWt. Der Kessel wird Holz verbrennen. Teil des Projekts ist die Entfernung des bestehenden veralteten Biomassekessels, die Installation neuer Transferstationen bei den Streikkunden, der Bau neuer Wärmeverteilungssysteme für den Anschluss neuer Kunden und die Installation von Transferstationen., translated_summary
  • curprev 09:3509:35, 2 December 2021DG Regio talk contribs 13,130 bytes +127 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:2018:20, 28 November 2021DG Regio talk contribs 13,003 bytes +1,241 Created claim: summary (P836): Installation d’une chaudière à biomasse d’une capacité de 2,5 MWt. La chaudière brûlera du bois. Une partie du projet est la suppression de la chaudière à biomasse obsolète existante, l’installation de nouvelles stations de transfert chez les clients de grève, la construction de nouveaux systèmes de distribution de chaleur pour connecter de nouveaux clients et l’installation de stations de transfert., translated_summary
  • curprev 18:2018:20, 28 November 2021DG Regio talk contribs 11,762 bytes +141 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:3616:36, 22 October 2020DG Regio talk contribs 12,070 bytes +1,198 Created claim: summary (P836): Installation of boiler for combustion of biomass with an output of 2,5 MWt. The boiler will burn wood matter. Part of the project is the removal of the existing outdated boiler for the combustion of biomass, installation of new delivery stations at hundreds of customers, construction of new heat distributions for connecting new customers and installation of transfer stations., translated_summary
  • curprev 16:3616:36, 22 October 2020DG Regio talk contribs 10,872 bytes −735 Removed claim: summary (P836): Installation of a biomass boiler with a capacity of 2,5 MWth. The boiler will burn wood paste. The project includes the removal of the existing obsolete boiler on the burning of biomass, the installation of new transfer stations on strike, the construction of new heat distribution facilities to connect new customers and the installation of the production lines., remove_old_english_translation
  • curprev 07:5607:56, 22 October 2020DG Regio talk contribs 11,607 bytes +123 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 07:5607:56, 22 October 2020DG Regio talk contribs 11,484 bytes −129 Changed label, description and/or aliases in 1 language: remove_english_label

24 September 2020

22 September 2020

15 July 2020

6 June 2020

25 March 2020

19 March 2020

25 February 2020

  • curprev 11:2211:22, 25 February 2020DG Regio talk contribs 10,345 bytes +735 Created claim: summary (P836): Installation of a biomass boiler with a capacity of 2,5 MWth. The boiler will burn wood paste. The project includes the removal of the existing obsolete boiler on the burning of biomass, the installation of new transfer stations on strike, the construction of new heat distribution facilities to connect new customers and the installation of the production lines., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020