Revision history of "Heating plant JIH – boiler for biomass, heat distribution, DPST" (Q15342)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

19 June 2023

11 June 2023

17 February 2023

3 July 2022

  • curprev 03:0503:05, 3 July 2022DG Regio talk contribs 41,479 bytes +22,916 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

13 December 2021

2 December 2021

28 November 2021

  • curprev 18:2018:20, 28 November 2021DG Regio talk contribs 14,534 bytes +1,130 Created claim: summary (P836): Installation d’une chaudière à biomasse d’une capacité de 5,6 MW, extension de la distribution de chaleur de l’usine de chauffage JIH en liaison avec le raccordement de nouveaux clients. Installation de nouvelles stations de transfert, installation et construction d’une station de remise en forme., translated_summary
  • curprev 18:2018:20, 28 November 2021DG Regio talk contribs 13,404 bytes +145 Changed label, description and/or aliases in fr: translated_label

28 October 2020

22 October 2020

  • curprev 16:3616:36, 22 October 2020DG Regio talk contribs 13,704 bytes +1,088 Created claim: summary (P836): Installation of boiler for combustion of biomass with an output of 5.6 MW, extension of heat distribution from JIH heat plant in connection with connection of new customers. Installation of new transfer stations, installation and construction of a training station. a., translated_summary
  • curprev 16:3616:36, 22 October 2020DG Regio talk contribs 12,616 bytes −634 Removed claim: summary (P836): Installation of a biomass boiler with a power of 5.6 MW, expansion of the heat distribution from the Heat Plant by JIH, in connection with the connection of new customers. Installation of new transfer stations, installation and construction of booster stations., remove_old_english_translation
  • curprev 07:5607:56, 22 October 2020DG Regio talk contribs 13,250 bytes +124 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 07:5607:56, 22 October 2020DG Regio talk contribs 13,126 bytes −127 Changed label, description and/or aliases in 1 language: remove_english_label

15 July 2020

19 June 2020

6 June 2020

25 March 2020

3 March 2020

25 February 2020

  • curprev 11:2211:22, 25 February 2020DG Regio talk contribs 11,567 bytes +634 Created claim: summary (P836): Installation of a biomass boiler with a power of 5.6 MW, expansion of the heat distribution from the Heat Plant by JIH, in connection with the connection of new customers. Installation of new transfer stations, installation and construction of booster stations., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020