Revision history of "Construction of biomass heating plant by LESS & ENERGY s.r.o. in Long Vsi" (Q15341)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

11 June 2023

17 February 2023

3 July 2022

  • curprev 03:0503:05, 3 July 2022DG Regio talk contribs 44,786 bytes +25,266 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 09:3509:35, 2 December 2021DG Regio talk contribs 15,417 bytes +1,212 Created claim: summary (P836): Das Projekt wird einen Kesselraum bauen und einen Kessel mit einer Wärmeleistung von 800 kW installieren. Der Rohstoff für diesen Kessel ist der Abfallbraun-Chip aus dem Entrindungsprozess der Holzbearbeitungsanlage LESS & TIMBER, a.s., der auch Kunde der produzierten Wärme sein wird. Durch die Durchführung des Projekts werden schädliche Emissionen in die Luft deutlich reduziert., translated_summary
  • curprev 09:3509:35, 2 December 2021DG Regio talk contribs 14,205 bytes +131 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:2018:20, 28 November 2021DG Regio talk contribs 14,074 bytes +1,252 Created claim: summary (P836): Le projet permettra de construire une chaufferie et d’installer une chaudière d’une puissance calorifique de 800 kW. La matière première de cette chaudière sera les déchets bruns du processus d’écorçage de l’usine de travail du bois LESS & TIMBER, a.s., qui sera également le client de la chaleur produite. La mise en œuvre du projet permettra de réduire considérablement les émissions nocives dans l’air., translated_summary
  • curprev 18:2018:20, 28 November 2021DG Regio talk contribs 12,822 bytes +155 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:3616:36, 22 October 2020DG Regio talk contribs 13,116 bytes +1,212 Created claim: summary (P836): As part of the project, the boiler room will be built and a boiler with a heat output of 800 kW will be installed. The raw material for this boiler will be a waste brown chip from the debarking process of the woodworking company LESS & TIMBER, a.s., which will also be a customer of the heat produced. Implementation of the project will significantly reduce harmful emissions into the air. a., translated_summary
  • curprev 16:3616:36, 22 October 2020DG Regio talk contribs 11,904 bytes −759 Removed claim: summary (P836): The project will build a boiler and installation of a boiler with a heat output of 800 kW. The raw material for this boiler will be waste brown chips from the process of debarking the wood company, LESS & Timer, a.s., which will at the same time be a purchaser of the produced heat. The implementation of the project will lead to a significant reduction of harmful emissions in the air., remove_old_english_translation
  • curprev 07:5607:56, 22 October 2020DG Regio talk contribs 12,663 bytes +132 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 07:5607:56, 22 October 2020DG Regio talk contribs 12,531 bytes −133 Changed label, description and/or aliases in 1 language: remove_english_label

24 September 2020

22 September 2020

15 July 2020

6 June 2020

25 March 2020

25 February 2020

  • curprev 11:2211:22, 25 February 2020DG Regio talk contribs 11,384 bytes +759 Created claim: summary (P836): The project will build a boiler and installation of a boiler with a heat output of 800 kW. The raw material for this boiler will be waste brown chips from the process of debarking the wood company, LESS & Timer, a.s., which will at the same time be a purchaser of the produced heat. The implementation of the project will lead to a significant reduction of harmful emissions in the air., Adding English summary

17 February 2020

12 February 2020

10 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020