Revision history of "Expansion of production and storage of the Bílin acid site" (Q14488)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

19 June 2023

11 June 2023

20 February 2023

17 February 2023

3 July 2022

  • curprev 02:2802:28, 3 July 2022DG Regio talk contribs 44,138 bytes +25,513 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 09:2909:29, 2 December 2021DG Regio talk contribs 14,488 bytes +1,249 Created claim: summary (P836): Gegenstand des Projekts ist der Braunfeldstandort des ehemaligen Weißsäurespeichers aus dem Jahr 1971. Das Projekt soll bestehende Gebäude abbauen, um Produktions- und Lagerkapazitäten für Modere zu bauen. Das Projekt wird in der Variante des Abrisses der bestehenden 3 Gebäude und dem Bau eines späteren Neubaus behandelt, da die bestehenden Gebäude technisch vollständig vernachlässigt und nicht rekonstruiert werden., translated_summary
  • curprev 09:2909:29, 2 December 2021DG Regio talk contribs 13,239 bytes +131 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:1418:14, 28 November 2021DG Regio talk contribs 13,108 bytes +1,267 Created claim: summary (P836): L’objet du projet est le site de friches de l’ancien magasin d’acides blancs de 1971. Le projet démolira les bâtiments existants afin de construire des capacités de production et de stockage modérées. Le projet sera traité dans la variante de la démolition des 3 bâtiments existants et de la construction d’un nouveau bâtiment ultérieur, les bâtiments existants étant techniquement complètement négligés et non reconstruits., translated_summary
  • curprev 18:1418:14, 28 November 2021DG Regio talk contribs 11,841 bytes +129 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:0416:04, 22 October 2020DG Regio talk contribs 12,161 bytes +1,227 Created claim: summary (P836): The object of the project is the brownfield of the former white acid warehouse from 1971. The project will demolish existing buildings in order to build moderation of production and storage capacities. The project will be solved in a variant of demolition of the existing 3 buildings and the construction of the subsequent new building, as the existing buildings are technically neglected and unrefurbished., translated_summary
  • curprev 16:0416:04, 22 October 2020DG Regio talk contribs 10,934 bytes −783 Removed claim: summary (P836): The purpose of the project is the brownfield site of the former store in white acids of 1971. The project will carry out demolition of existing buildings in order to build a modern production capacity. The project will be dealt with in the option of demolition of the current 3 sites and the construction of a subsequent new construction, as the existing buildings are technically neglected and unreconstructed., remove_old_english_translation
  • curprev 06:5306:53, 22 October 2020DG Regio talk contribs 11,717 bytes +118 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 06:5306:53, 22 October 2020DG Regio talk contribs 11,599 bytes −133 Changed label, description and/or aliases in 1 language: remove_english_label

24 September 2020

22 September 2020

15 July 2020

6 June 2020

25 March 2020

19 March 2020

25 February 2020

  • curprev 11:0311:03, 25 February 2020DG Regio talk contribs 10,458 bytes +783 Created claim: summary (P836): The purpose of the project is the brownfield site of the former store in white acids of 1971. The project will carry out demolition of existing buildings in order to build a modern production capacity. The project will be dealt with in the option of demolition of the current 3 sites and the construction of a subsequent new construction, as the existing buildings are technically neglected and unreconstructed., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020