Revision history of "Reconstruction of the J.M.Kapa complex, s.r.o. Kolín" (Q14320)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:5018:50, 8 October 2024DG Regio talk contribs 49,686 bytes −6 Set a claim value: summary (P836): O projeto é a terceira parte da reconstrução das instalações da empresa, que é marcada pela construção gradual de edifícios individuais ao longo de cerca de 120 anos. Resolve locais críticos:-Má, em alguns casos a condição técnica de emergência da construção e cobertura dos edifícios originais-Desordem total do complexo Centra-se principalmente na reconstrução final das instalações originais, o arranjo definitivo das instalações da empresa em termos...

22 March 2024

15 January 2024

11 June 2023

20 February 2023

17 February 2023

3 July 2022

  • curprev 02:2402:24, 3 July 2022DG Regio talk contribs 48,548 bytes +28,334 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 09:2909:29, 2 December 2021DG Regio talk contribs 15,576 bytes +1,421 Created claim: summary (P836): Das Projekt ist der dritte Teil des Umbaus des Firmengeländes, der durch den schrittweisen Bau einzelner Gebäude über 120 Jahre geprägt ist. Löst kritische Orte:-Bad, in einigen Fällen, Notfall technischer Zustand der Konstruktion und Verkleidung der ursprünglichen Gebäude-Total Desorganisation des Komplexes Es ist hauptsächlich auf die endgültige Rekonstruktion der ursprünglichen Räumlichkeiten des Komplexes, die endgültige Anordnung der Räumli...
  • curprev 09:2909:29, 2 December 2021DG Regio talk contribs 14,155 bytes +99 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:0918:09, 28 November 2021DG Regio talk contribs 14,056 bytes +1,466 Created claim: summary (P836): Le projet est la troisième partie de la reconstruction des locaux de l’entreprise, marquée par la construction progressive de bâtiments individuels sur environ 120 ans. Résout des lieux critiques:-Bad, dans certains cas, état technique d’urgence de la construction et du revêtement des bâtiments d’origine-Désorganisation totale du complexe Il est principalement axé sur la reconstruction finale des locaux d’origine du complexe, l’arrangement défin...
  • curprev 18:0918:09, 28 November 2021DG Regio talk contribs 12,590 bytes +100 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 15:4315:43, 22 October 2020DG Regio talk contribs 12,939 bytes +1,415 Created claim: summary (P836): The project is the third part of the reconstruction of the company’s premises, which is marked by the gradual construction of individual buildings over the course of about 120 years. Solves critical sites:-Bad, in some cases the emergency technical condition of the construction and covering of the original buildings-Total disorder of the complex It is focused mainly on the final reconstruction of the original premises, the definitive arrangement...
  • curprev 15:4315:43, 22 October 2020DG Regio talk contribs 11,524 bytes −992 Removed claim: summary (P836): The project is a third part of the reconstruction of the business site, marked by a gradual construction of individual premises over 120 years. It addresses the critical locations of the following sites, in some cases the emergency technical condition of structure and cladding of the original site, the site’s overall lack of organisation. it shall, in particular, aim at the final reconstruction of the original premises of the site, the definit...
  • curprev 07:3907:39, 22 October 2020DG Regio talk contribs 12,516 bytes +112 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 07:3907:39, 22 October 2020DG Regio talk contribs 12,404 bytes −104 Changed label, description and/or aliases in 1 language: remove_english_label

15 July 2020

6 June 2020

25 March 2020

25 February 2020

  • curprev 11:0211:02, 25 February 2020DG Regio talk contribs 11,217 bytes +992 Created claim: summary (P836): The project is a third part of the reconstruction of the business site, marked by a gradual construction of individual premises over 120 years. It addresses the critical locations of the following sites, in some cases the emergency technical condition of structure and cladding of the original site, the site’s overall lack of organisation. it shall, in particular, aim at the final reconstruction of the original premises of the site, the definitiv...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020