Revision history of "Reconstruction – Expansion of DYNEX production premises" (Q14218)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:5118:51, 8 October 2024DG Regio talk contribs 51,396 bytes +3 Changed label, description and/or aliases in pt
  • curprev 18:5118:51, 8 October 2024DG Regio talk contribs 51,393 bytes +3 Set a claim value: summary (P836): O objetivo do projeto é ampliar o espaço de produção da empresa. O projeto será executado nas instalações da antiga ZZD em Buštěhrad. O edifício em causa é uma sala de estanho – uma antiga instalação de engorda de suínos, que foi posteriormente explorada como carpintaria, carpintaria e instalação de secagem de madeira. A condição técnica da construção é má, insatisfatória, a manutenção negligenciada. A reconstrução do edifício na forma necessária pa...

7 March 2024

15 January 2024

11 June 2023

20 February 2023

17 February 2023

3 July 2022

  • curprev 02:2102:21, 3 July 2022DG Regio talk contribs 49,461 bytes +28,641 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 09:2909:29, 2 December 2021DG Regio talk contribs 17,038 bytes +1,400 Created claim: summary (P836): Gegenstand des Projekts ist die Erweiterung der Produktionsstätten des Unternehmens. Das Projekt wird im Bereich des ehemaligen JZD in Buštěhrad durchgeführt. Das in Rede stehende Gebäude ist eine Zinnhalle – eine ehemalige Schweinemastanlage, die später als Tischler, Zimmerei und Holztrockner betrieben wurde. Bautechnischer Zustand ist schlecht, unbefriedigend, Wartung vernachlässigt. Der Umbau des Gebäudes in die für die Durchführung der Aktiv...
  • curprev 09:2909:29, 2 December 2021DG Regio talk contribs 15,638 bytes +118 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:0818:08, 28 November 2021DG Regio talk contribs 15,520 bytes +1,474 Created claim: summary (P836): L’objet du projet est l’agrandissement des locaux de production de l’entreprise. Le projet sera mis en œuvre dans la zone de l’ancien JZD à Buštěhrad. Le bâtiment en question est un hall d’étain — une ancienne usine d’engraissement de porc, qui a ensuite été exploitée comme menuiserie, menuiserie et sécheuse à bois. L’état technique de la construction est médiocre, insatisfaisant, l’entretien est négligé. La reconstruction du bâtiment sous la fo...
  • curprev 18:0818:08, 28 November 2021DG Regio talk contribs 14,046 bytes +130 Changed label, description and/or aliases in fr: translated_label

28 October 2020

22 October 2020

  • curprev 16:0016:00, 22 October 2020DG Regio talk contribs 14,361 bytes +1,417 Created claim: summary (P836): The purpose of the project is to expand the production space of the company. The project will be implemented on the premises of the former ZZD in Buštěhrad. The building concerned is a tin hall – an earlier fattening plant of pigs, which was later operated as a carpentry, carpentry and wood-drying plant. Construction-technical condition is bad, unsatisfactory, maintenance neglected. The reconstruction of the building into the required form neces...
  • curprev 16:0016:00, 22 October 2020DG Regio talk contribs 12,944 bytes −914 Removed claim: summary (P836): The purpose of the project is to extend the production area of the company. The project will be carried out on the premises of the former JZD in Bordern. The plant concerned was the house of the former pig farm, which was later served as the car’s joinery, carpentry and drying rooms. Poor civil engineering condition is poor, inadequate maintenance. The renovation of the building up to what is required to implement the company’s activities is t...
  • curprev 07:3307:33, 22 October 2020DG Regio talk contribs 13,858 bytes +116 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 07:3307:33, 22 October 2020DG Regio talk contribs 13,742 bytes −123 Changed label, description and/or aliases in 1 language: remove_english_label

15 July 2020

19 June 2020

6 June 2020

25 March 2020

3 March 2020

25 February 2020

  • curprev 10:4610:46, 25 February 2020DG Regio talk contribs 12,187 bytes +914 Created claim: summary (P836): The purpose of the project is to extend the production area of the company. The project will be carried out on the premises of the former JZD in Bordern. The plant concerned was the house of the former pig farm, which was later served as the car’s joinery, carpentry and drying rooms. Poor civil engineering condition is poor, inadequate maintenance. The renovation of the building up to what is required to implement the company’s activities is too...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020