Revision history of "Reconstruction of the production hall of PUMAX, spol. s r.o." (Q14191)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:2806:28, 9 October 2024DG Regio talk contribs 50,095 bytes 0 Changed label, description and/or aliases in pt
  • curprev 06:2806:28, 9 October 2024DG Regio talk contribs 50,095 bytes +1 Set a claim value: summary (P836): A reconstrução e a correspondente ampliação de imóveis consiste em ajustar os edifícios às necessidades de produção atuais e futuras da PUMAX. Os investimentos em novas tecnologias, o aumento dos volumes de produção e o crescimento nos últimos anos levaram à necessidade de modificar e expandir as instalações de produção. Foi necessário adaptar os edifícios aos actuais fluxos de materiais e assegurar áreas de produção suficientes para o desenvolvimen...

7 March 2024

15 January 2024

19 June 2023

11 June 2023

17 February 2023

3 July 2022

  • curprev 02:2002:20, 3 July 2022DG Regio talk contribs 47,424 bytes +27,223 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 09:2709:27, 2 December 2021DG Regio talk contribs 15,803 bytes +1,359 Created claim: summary (P836): Der Umbau und die damit verbundene Erweiterung von Immobilien bestehen in der Anpassung von Gebäuden an den aktuellen und zukünftigen Produktionsbedarf in PUMAX. Investitionen in neue Technologien, höhere Produktionsmengen und Wachstum in den letzten Jahren haben die Notwendigkeit einer Modifikation und Erweiterung der Produktionsanlagen ausgelöst. Es ist notwendig, die Gebäude an die aktuellen Materialflüsse anzupassen und ausreichende Produkti...
  • curprev 09:2709:27, 2 December 2021DG Regio talk contribs 14,444 bytes +109 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:0918:09, 28 November 2021DG Regio talk contribs 14,335 bytes +1,413 Created claim: summary (P836): La reconstruction et l’extension de l’immobilier qui y est associée consistent en l’adaptation des bâtiments pour les besoins actuels et futurs de production dans PUMAX. Les investissements dans les nouvelles technologies, l’augmentation des volumes de production et la croissance au cours des dernières années ont rendu nécessaire la modification et l’expansion des installations de production. Il est nécessaire d’adapter les bâtiments aux flux de...
  • curprev 18:0918:09, 28 November 2021DG Regio talk contribs 12,922 bytes +122 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:0016:00, 22 October 2020DG Regio talk contribs 13,249 bytes +1,285 Created claim: summary (P836): The reconstruction and the related extension of real estate consists of adjusting the buildings for the current and prospective production needs of PUMAX. Investments in new technologies, increased production volumes and growth in recent years have led to the need to modify and expand production facilities. There has been a need to adapt buildings to current material flows and to ensure sufficient production areas for planned development in the...
  • curprev 16:0016:00, 22 October 2020DG Regio talk contribs 11,964 bytes −880 Removed claim: summary (P836): The renovation and the connection of the connection with the building of the properties lies in the adaptation of the premises to the actual and planned needs of production in the company PMAX. Investment in new technologies, an increase in production volumes and growth in recent years have led to the need to adapt and expand production sites. The need arose to adapt the buildings to current materials streams and to ensure sufficient productio...
  • curprev 07:3307:33, 22 October 2020DG Regio talk contribs 12,844 bytes +119 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 07:3307:33, 22 October 2020DG Regio talk contribs 12,725 bytes −118 Changed label, description and/or aliases in 1 language: remove_english_label

15 July 2020

6 June 2020

25 March 2020

25 February 2020

  • curprev 10:4510:45, 25 February 2020DG Regio talk contribs 11,552 bytes +880 Created claim: summary (P836): The renovation and the connection of the connection with the building of the properties lies in the adaptation of the premises to the actual and planned needs of production in the company PMAX. Investment in new technologies, an increase in production volumes and growth in recent years have led to the need to adapt and expand production sites. The need arose to adapt the buildings to current materials streams and to ensure sufficient production...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020