Revision history of "Reconstruction of building np 565 in Kostelec nad Orlicí" (Q14149)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:2806:28, 9 October 2024DG Regio talk contribs 46,181 bytes −5 Set a claim value: summary (P836): No âmbito da execução do projeto será adquirido e posteriormente reconstruído imóvel, que está registado na base de dados nacional brownfield. Atualmente, o objeto não é utilizado e encontra-se em condições negligenciadas e tecnicamente inadequadas. Para que o objeto volte a estar operacional, é necessário concluir uma reconstrução completa.

22 March 2024

15 January 2024

11 June 2023

17 February 2023

3 July 2022

  • curprev 02:1902:19, 3 July 2022DG Regio talk contribs 43,516 bytes +24,432 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 09:2309:23, 2 December 2021DG Regio talk contribs 15,168 bytes +1,194 Created claim: summary (P836): Im Rahmen der Durchführung des Projekts wird die Immobilie erworben und anschließend renoviert, die in der National Brownfield Database registriert ist. Derzeit ist das Objekt unbenutzt und befindet sich in einem vernachlässigten und technisch unbefriedigenden Zustand. Damit das Gebäude wieder einsatzbereit ist, muss eine komplette Rekonstruktion durchgeführt werden., translated_summary
  • curprev 09:2309:23, 2 December 2021DG Regio talk contribs 13,974 bytes +110 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:0718:07, 28 November 2021DG Regio talk contribs 13,864 bytes +1,203 Created claim: summary (P836): Dans le cadre de la mise en œuvre du projet, le bien sera acquis puis rénové, qui est enregistré dans la base de données nationale sur les sites contaminés. Actuellement, l’objet est inutilisé et est dans un état négligé et techniquement insatisfaisant. Pour que le bâtiment soit de nouveau opérationnel, il est nécessaire de procéder à une reconstruction complète., translated_summary
  • curprev 18:0718:07, 28 November 2021DG Regio talk contribs 12,661 bytes +117 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 15:5815:58, 22 October 2020DG Regio talk contribs 12,993 bytes +1,173 Created claim: summary (P836): Within the implementation of the project will be acquired and subsequently reconstructed property, which is registered in the National database brownfield. The object is currently unused and is in a neglected and technically unsuitable condition. In order for the object to be operational again, it is necessary to complete a complete reconstruction. a., translated_summary
  • curprev 15:5815:58, 22 October 2020DG Regio talk contribs 11,820 bytes −717 Removed claim: summary (P836): As part of the implementation of the project, the property will be acquired and subsequently rebuilt, which is registered in the National database of brownfield sites. Currently an object is not used and is in a brownish and technically unsatisfactory condition. In order to be operational again, there is a need for full reconstruction of a. a., remove_old_english_translation
  • curprev 07:2207:22, 22 October 2020DG Regio talk contribs 12,537 bytes +116 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 07:2207:22, 22 October 2020DG Regio talk contribs 12,421 bytes −118 Changed label, description and/or aliases in 1 language: remove_english_label

24 September 2020

22 September 2020

15 July 2020

6 June 2020

25 March 2020

19 March 2020

25 February 2020

  • curprev 10:5010:50, 25 February 2020DG Regio talk contribs 11,272 bytes +717 Created claim: summary (P836): As part of the implementation of the project, the property will be acquired and subsequently rebuilt, which is registered in the National database of brownfield sites. Currently an object is not used and is in a brownish and technically unsatisfactory condition. In order to be operational again, there is a need for full reconstruction of a. a., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020