Revision history of "Reconstruction of the building of the Non-public Health Care Department with changes in the use of the first floor and attic for residential purposes and land development." (Q139095)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3720:37, 2 March 2023DG Regio talk contribs 65,304 bytes −584 Changed label, description and/or aliases in it, da, sk, lv, ga, fi, de, sv, cs, bg, et, ro, mt, es, pt, fr, sl, hu, hr, nl, el, lt, and other parts

27 October 2022

26 October 2022

24 October 2022

3 July 2022

  • curprev 02:0702:07, 3 July 2022DG Regio talk contribs 63,770 bytes +40,040 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

3 December 2021

29 October 2020

21 October 2020

  • curprev 20:0220:02, 21 October 2020DG Regio talk contribs 12,981 bytes +231 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 20:0220:02, 21 October 2020DG Regio talk contribs 12,750 bytes −280 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 20:0220:02, 21 October 2020DG Regio talk contribs 13,030 bytes +1,897 Created claim: summary (P836): The core of the project is the reconstruction of the building of the Non-public Health Care Department with the change of use of the floor and attic into social housing. Through the implementation of the project, the revitalisation area will be revived through multi-faceted actions for the local community, space and the economy. The following effects will be used to achieve the main objective, as well as to achieve the expected effects of the re...
  • curprev 20:0220:02, 21 October 2020DG Regio talk contribs 11,133 bytes −1,381 Removed claim: summary (P836): The essence of the project is the renovation of the Building of the Niepodległości of the Healthcare Service with a change in the use of the floors and the social housing. The project will lead to a revitalisation of the regeneration area through multifaceted actions for the benefit of the local population, space and the economy. Achievement of the main goal and the realisation of the desired effects of regeneration have the following effects:...

24 September 2020

23 June 2020

10 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:1310:13, 11 March 2020DG Regio talk contribs 11,225 bytes +1,381 Created claim: summary (P836): The essence of the project is the renovation of the Building of the Niepodległości of the Healthcare Service with a change in the use of the floors and the social housing. The project will lead to a revitalisation of the regeneration area through multifaceted actions for the benefit of the local population, space and the economy. Achievement of the main goal and the realisation of the desired effects of regeneration have the following effects: t...

25 February 2020

18 February 2020

31 January 2020

14 January 2020