Revision history of "Raising standards of paediatric care through the purchase of medical equipment and modernisation of branches located in the Children’s Pavilion at the M. Copernicus Voivodeship Hospital in Koszalin" (Q139029)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:5115:51, 7 October 2024DG Regio talk contribs 94,829 bytes +36 Changed label, description and/or aliases in pt
  • curprev 15:5115:51, 7 October 2024DG Regio talk contribs 94,793 bytes −16 Set a claim value: summary (P836): Este projecto será um projecto de infra-estruturas. A sua execução pode ser dividida em duas fases principais: Fase I – ROBOTES DE BUDOWLANE (movidos no modo «conceção e construção»). Esta tarefa basear-se-á na execução de obras de renovação e construção nos seguintes domínios: 1) Modernização do Pavilhão da Criança (edifício “C”) – constituído por reconstrução interna: a) Câmara de Acolhimento Infantil, b) Departamento de Anestesiologia, Cuidados I...

22 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3720:37, 2 March 2023DG Regio talk contribs 91,635 bytes −178 Changed label, description and/or aliases in lv, it, da, sk, lt, hu, ro, pt, sv, fr, es, fi, ga, el, de, sl, hr, et, bg, cs, nl, mt, and other parts

27 October 2022

26 October 2022

24 October 2022

27 July 2022

  • curprev 18:3918:39, 27 July 2022DG Regio talk contribs 89,704 bytes +58,684 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

3 December 2021

29 October 2020

21 October 2020

  • curprev 19:4619:46, 21 October 2020DG Regio talk contribs 14,995 bytes +259 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:4619:46, 21 October 2020DG Regio talk contribs 14,736 bytes −238 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:4619:46, 21 October 2020DG Regio talk contribs 14,974 bytes +2,883 Created claim: summary (P836): This project will be an infrastructure project. Its implementation can be divided into two main stages: Stage I – BUDOWLANE ROBOTS (driven in “design and build” mode). This task will be based on the implementation of renovation and construction works in the area of: 1) Modernisation of the Children’s Pavilion (building “C”) – consisting of internal reconstruction: a) Children’s Reception Chamber, b) Department of Anaesthesiology, Intensive Child...
  • curprev 19:4619:46, 21 October 2020DG Regio talk contribs 12,091 bytes −2,355 Removed claim: summary (P836): The project will constitute an infrastructure project. Its implementation can be divided into two main phases: Stage I — BUILDING BUILDINGS (“Design and Explosion”). This task will be based on the completion of renovation and construction work on: 1) Modernisation of the Children’s Pavilion (‘C’ building) — consisting of an internal conversion: (a) To be adopted by the Chamber of Children’s Reception, (b) Branch of the Anestejology, Other inte...

24 September 2020

23 June 2020

11 June 2020

7 June 2020

26 March 2020

11 March 2020

  • curprev 10:1310:13, 11 March 2020DG Regio talk contribs 13,168 bytes +2,355 Created claim: summary (P836): The project will constitute an infrastructure project. Its implementation can be divided into two main phases: Stage I — BUILDING BUILDINGS (“Design and Explosion”). This task will be based on the completion of renovation and construction work on: 1) Modernisation of the Children’s Pavilion (‘C’ building) — consisting of an internal conversion: (a) To be adopted by the Chamber of Children’s Reception, (b) Branch of the Anestejology, Other intens...

25 February 2020

18 February 2020

31 January 2020

14 January 2020