Revision history of "Reconstruction of 1 May Street in Gryfin" (Q138063)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:5115:51, 7 October 2024DG Regio talk contribs 48,328 bytes −2 Changed label, description and/or aliases in pt
  • curprev 15:5115:51, 7 October 2024DG Regio talk contribs 48,330 bytes −15 Set a claim value: summary (P836): O projeto é um projeto estacionário de uma etapa. De acordo com o tipo de projetos permitidos, que é a construção e/ou reconstrução de estradas distritais, a reconstrução de 0,45 km de ul. 1 de Maio em Gryfin em secções de ul. Nadodrzańska-atravessar de St. Chrobrygo e da junção com a rua. Chrobry para St. A rapariga do parque. Estes troços são a ligação entre a estação ferroviária (na linha RTE-T) e a marina da cidade de Gryfina.

22 March 2024

15 January 2024

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3420:34, 2 March 2023DG Regio talk contribs 45,948 bytes +383 Changed label, description and/or aliases in da, it, lv, bg, sk, el, fr, ro, et, sl, ga, pt, sv, fi, cs, es, de, hu, hr, lt, nl, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

3 July 2022

  • curprev 01:2701:27, 3 July 2022DG Regio talk contribs 43,434 bytes +25,434 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 22:0622:06, 2 December 2021DG Regio talk contribs 12,413 bytes +1,340 Created claim: summary (P836): Le projet est un projet stationnaire, mis en œuvre en une seule étape. Selon le type admissible de projets, c’est-à-dire la construction et/ou la reconstruction de routes de district, il prévoit de reconstruire 0,45 km de routes. 1er mai à Gryfin sur les sections d’ul. Nadodrzańska-crossing de ul. Chrobrego et de l’intersection avec ul. Chrobrego à St. C’est un parc. Ces tronçons constituent une liaison entre la gare ferroviaire (sur le réseau R...
  • curprev 22:0622:06, 2 December 2021DG Regio talk contribs 11,073 bytes +104 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:4919:49, 21 October 2020DG Regio talk contribs 11,408 bytes +99 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:4919:49, 21 October 2020DG Regio talk contribs 11,309 bytes −108 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:4919:49, 21 October 2020DG Regio talk contribs 11,417 bytes +1,277 Created claim: summary (P836): The project is a stationary one-step project. According to the permissible type of projects, which is the construction and/or reconstruction of district roads, the reconstruction of 0.45 km of ul. 1 May in Gryfin on sections of ul. Nadodrzańska-crossing from St. Chrobrygo and from the junction with the street. Chrobry to St. The park girl. These sections are the connection between the railway station (on the TEN-T line) and the city marina in Gr...
  • curprev 19:4919:49, 21 October 2020DG Regio talk contribs 10,140 bytes −839 Removed claim: summary (P836): The project is stationary in its one-step nature. According to the permissible type of project to which the construction and/or reconstruction of district roads is involved, a 0.45 km reconstruction of ul. On 1 May in Gryfinno ul. Overzeńska-junction with ul. Chrobrego and junction with ul. Chrobrego to ul. Parkowa. The sections described are the connection between the railway station (on the line of the TEN-T network) and the urban planning s...

24 September 2020

23 June 2020

11 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 21:3021:30, 10 March 2020DG Regio talk contribs 9,691 bytes +839 Created claim: summary (P836): The project is stationary in its one-step nature. According to the permissible type of project to which the construction and/or reconstruction of district roads is involved, a 0.45 km reconstruction of ul. On 1 May in Gryfinno ul. Overzeńska-junction with ul. Chrobrego and junction with ul. Chrobrego to ul. Parkowa. The sections described are the connection between the railway station (on the line of the TEN-T network) and the urban planning sta...

25 February 2020

18 February 2020

31 January 2020

14 January 2020