Revision history of "Reconstruction of district roads No. 3514Z on the section of Borkowice-Dobrzyca and Nr 3523Z on the section Popowo-Dobre" (Q138062)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 05:4805:48, 10 October 2024DG Regio talk contribs 83,520 bytes −4 Changed label, description and/or aliases in pt
  • curprev 05:4805:48, 10 October 2024DG Regio talk contribs 83,524 bytes −28 Set a claim value: summary (P836): O projeto diz respeito à reconstrução da estrada existente com uma introdução abrangente ao padrão da estrada distrital em termos de capacidade de carga, largura e segurança. Entre outros, serão feitas a desidratação, a definição de perfis e a compactação do solo, novas fundações feitas de agregados partidos, substrato agregado estabilizado de cimento melhorado e suporte de betão asfáltico. Haverá um reparo de rachaduras no pavimento e um novo pavim...

20 March 2024

15 January 2024

14 June 2023

10 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 18:3218:32, 27 July 2022DG Regio talk contribs 77,222 bytes +49,309 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

13 December 2021

2 December 2021

  • curprev 22:0622:06, 2 December 2021DG Regio talk contribs 16,573 bytes +2,751 Created claim: summary (P836): Le projet concerne la reconstruction d’une route existante avec une approche globale de la norme de la route de district en termes de capacité de charge, de largeur et de sécurité. La déshydratation, le profilage et le compactage du substrat, de nouvelles bases à partir d’agrégats brisés, de substrats d’agrégats stabilisés par le ciment amélioré et de béton bitumineux seront réalisés entre autres. Réparation des fissures dans le trottoir et un n...
  • curprev 22:0622:06, 2 December 2021DG Regio talk contribs 13,822 bytes +181 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 19:4919:49, 21 October 2020DG Regio talk contribs 14,080 bytes +180 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 19:4919:49, 21 October 2020DG Regio talk contribs 13,900 bytes −156 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 19:4919:49, 21 October 2020DG Regio talk contribs 14,056 bytes +2,522 Created claim: summary (P836): The project concerns the reconstruction of the existing road with a comprehensive introduction to the standard of the district road in terms of load capacity and width and safety. Among others, dehydration, profiling and compaction of the ground, new foundations made of broken aggregates, improved cement stabilised aggregate substrate and asphalt concrete support will be made. There will be a repair of cracks in the pavement and a new pavement o...
  • curprev 19:4919:49, 21 October 2020DG Regio talk contribs 11,534 bytes −2,069 Removed claim: summary (P836): The project concerns the conversion of an existing road with a comprehensive link to the standard of the district road with regard to load capacity and width and safety. Includes dehydration, profiling and ground density, new subconstruction of broken aggregates, improved substrate from aggregates stabilised with cement and sub-construction of asphalt concrete. Repair of cracks in the pavement and a new asphalt road surface will be constructed...

25 September 2020

11 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 21:3021:30, 10 March 2020DG Regio talk contribs 12,317 bytes +2,069 Created claim: summary (P836): The project concerns the conversion of an existing road with a comprehensive link to the standard of the district road with regard to load capacity and width and safety. Includes dehydration, profiling and ground density, new subconstruction of broken aggregates, improved substrate from aggregates stabilised with cement and sub-construction of asphalt concrete. Repair of cracks in the pavement and a new asphalt road surface will be constructed....

25 February 2020

18 February 2020

31 January 2020

14 January 2020